On March 3, 2008 at approximately 1126 EST, the Radiation Protection organization at AREVA NP Inc. Lynchburg, determined that a shipment of fuel services equipment (Box 0454) exceeded the 200 mrem/hour dose rate specified in
10 CFR 71.47 (b)(1). The equipment was being returned after use during a refueling outage. Radiation Protection surveyed the shipping container and obtained a reading of approximately 340 mrem/hour. In accordance with
10 CFR 20.1906(d)(2) the final delivery carrier has also been notified. This immediate notification is being made in accordance with the requirements of
10 CFR 20.1906(d)(2) and
10CFR 71.47(b)(1).
The fuel cleaning equipment had been recently used during a refueling outage at Watts Bar.
- * * UPDATE FROM GEOFF WERTZ TO JOE O'HARA AT 1447 ON 3/3/08 * * *
Mr. Wertz reported that area around the hot spot on the container was smeared, and no evidence of loose surface contamination exists.
Notified R1DO(Caruso),
FSME(Morell), and
NMSS(Giitter)