NL-14-058, Browns Ferry, Units 1, 2, and 3 - Project Schedule for the Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1, Flooding, of The..
| ML14098A152 | |
| Person / Time | |
|---|---|
| Site: | (DPR-033, DPR-052, DPR-068) |
| Issue date: | 04/07/2014 |
| From: | Shea J W Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-14-058, L44 140407 002 | |
| Download: ML14098A152 (6) | |
Text
L44 140407 002 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402
CNL-14-058
April 7, 2014
10 CFR 50.54(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Project Schedule for the Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
Reference:
TVA Letter to NRC, "Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 11, 2014 In the referenced March 11, 2014 letter, the Tennessee Valley Authority (TVA) submitted an extension request regarding the Browns Ferry Nuclear Plant (BFN), flooding hazard reevaluation report (HRR). During the April 1, 2014, conference call with TVA, Nuclear Regulatory Commission staff requested the detailed schedule describing the tasks associated with completing the flooding HRR by the requested extension date of March 12, 2015.
The purpose of this letter is to provide the detailed schedule. Specifically, the enclosure to this letter provides the detailed schedule for completing the BFN flooding HRR project by March 12, 2015.
ENCLOSURE BROWNS FERRY NUCLEAR PLANT FLOODING REEVALUATION REPORT PROJECT SCHEDULE
E-1 of 3 E-2 of 3 E-3 of 3