ML061000729

From kanterella
Revision as of 04:45, 28 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
E-mail from D. Croulet of Entergy to Various, Regarding Well Summaries
ML061000729
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/15/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J D
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000729 (9)


Text

-James Noggle -FW. Well Summaries

_ _iagiei1 From: "Croulet, Donald" <dcroule@entergy.com>

To: "Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter .com>,"'Timothy Rice"' <tbrice @ gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @ nrc.gov"'<jdn © n -c.gov>, "Jones, T. R." <tjones2 © entergy.com>

Date: 12/15/05 5:09PM

Subject:

FW: Well Summaries From: Lavera, Ron Sent: Tt ursday, December 15, 2005 3:29 PM To: Croulet, Donald; Axelson, William L

Subject:

Well Summaries Don Would you please forward these to the NRC and DEC/DOH.Thanks Ron<<mwexecsummSort by-Date-Dec_15_2005.doc>>

<<mw_execsummSortby-Well-Dec_15_2005.doc>>

RLaVera entergy.com

<mailto:RLaVera

@entergy.com>

3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM NDIHTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO____1 1 1 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-lll Transformer Yard 188,000 pCi/HI-ITO

]0/6/05 U3-1 U3 Discharge Canal 417 pCi/A HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCiA HTO U3-TI U3 South Turbine 703 pCiA HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-lll Transformer Yard 682 pCi/I HTO (heavy rain)MW- 11 .Transformer Yard 632 pCi/l HT0 (back-up)10/21/05 MW-lll Transformer Yard 284,000 pCi/I HTO 10121105 U3-1 U3 Discharge Canal ND/ITO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10128/05 MW-IllI Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-lll Transformer Yard 302,000 pCi/A HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO I GAaxelson\mw_execsumm.doc On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 1:1/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transforner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/A HFTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-11l Transformer Yard 171,000 pCi/l HTO 11/22/05 MW- 11I Transformer Yard 180,000 pCi/I HTO U3-1 U3 Distharge .Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/A HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MW-38 End of IP-3 Discharge 15000 pCi/Il HTO -False Canal Concrete Positive due to sample__ _ _contamination.

12/5/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO._ Canal Concrete 12/08/05 MW-111 Transformer Yard 270,000 pCi/I HTO MH-3 Transformer Yard 894 pCi/l HTO MH-5 Transformer Yard 2,020 pCi/l HTO MH-6 Transformer Yard 37,100 pCi/l HTO 1:2/13/05 MV-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformer Yard 42,300 pCi/I HTO 2 G:\axeIson\mw_execsumm.doc On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/05 Gypsum ND/HTO -Gamma Algonquin ND/HTO -Gamma 5 th Street Well ND/HTO -Gamma 10/25/05 Rock Quarry ND/HTO -Gamma].1/8/05 5 th Street Well ND/IHTO -Gamma 11/30/05 Gypsum ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3 G:\axeIson\mw_execsumm.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th--)!

f":-; .'ID Date Location Sample Results M-1-3 12/8/2005 Transformer Yard 894 pCi/l HTO MI-S 12/8/2005 Transformer Yard 2,020 pCi/l HTO MHI-6 12/8/2005 Transformer Yard 37,100 pCi/i HTO ID Date Location Sample Results MW-30 11/22/2005 FSB Leakage Area -Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO ID j Date Location j Sample Results,,,,, l MWN-34 12/13/2005 Transformer Yard 63,900 Ci/I HTO MWN-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO ID Date Location Sample Results MWN-38 12/2/2005 End of IP-3 15000 pCi/l HTO -False Discharge Canal Positive due to sample Concrete contamination.

MWN-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MNP-38 12/6/2005 End of IP-3 Discharge Canal_ Concrete ND/HTO MWEXE-2.DOC Page 1 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/l HTO MLW- 11 10/5/2005 Transformer Yard 188,000 pCi/l HTO MW-il1 10/14/2005 Transformer Yard 682 pCi/l HTO (heavy rain)M.W-1 I1 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)MW- 11 10/21/2005 Transformer Yard 284,000 pCi/l HTO M.W-11l 10/28/2005 Transformer Yard 218,000 pCi/l HTO M.W- 11 11/4/2005 Transformer Yard 302,000 pCi/Q HOT M.W-111 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-111 11/18/2005 Transformer Yard 171,000 pCi/l HTO MW-ill 11/22/2005 Transformer Yard 180,000 pCi/l HTO ,';qr-.W-Ill 12/02/2005 Transformer Yard 125,000 pCiAl HTO MW-11l 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM NDIHT0 MW-108 9/28/2005 GT-N ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO_.I MWEXE-2.DOC Page 2 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U'-1 10/21/2005 U3 Discharge Canal ND/HTO UJ-1 10/28/2005 U3 Discharge Canal ND/HTO U';-1 11/4/2005 U3 Discharge Canal ND/HTO U';-1 11/10/2005 U3 Discharge Canal ND/HTO U_;__ 11/22/2005 U3 Discharge Canal ND/HTO U;-1 12/2/05 U3 Discharge Canal ND/HTO U2i-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO U2i-2 10/21/2005 U3 Discharge Canal ND/HTO'V I 10/28/2005 U3 Discharge Canal ND/HTO.4 4 F,),:,!; .....-& 4. 4 Ui-2 11/4/2005 U3 Discharge Canal ND/HTO U2;-2 11/10/2005 U3 Discharge Canal ND/HTO U2;-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U-;-3 10/6/2005 U3 Discharge Canal 439 pCi/l HTO Ur-3 10/21/2005 U3 Discharge Canal ND/HTO U- -3 10/28/2005 U3 Discharge Canal ND/HTO U-'-3 11/4/2005 U3 Discharge Canal ND/HTO U$ -3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3.-3 11/22/2005 U3 Discharge Canal ND/HTO Ur-3 12/2/05 U3 Discharge Canal ND/HTO U2.4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U2-4 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U2-4 U3 Condensate ND/HTO 11/4/2005 Polisher U2-4 U3 Condensate ND/HTO 11/10/2005 Polisher U-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-4 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/K HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MWEXE-2.DOC Page 3 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine ND/HTO U.;-T1 11/4/2005 U3 South Turbine ND/HTO U'-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine 1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine 1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine ND/HTO U$-T2 12/2/05 U3 North Turbine 1,329 pCill HTO MWEXE-2.DOC Page 4 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000 300,000 250,000 I C._° 200,000 0.Q E.150,000 I._100,000 50,000 0 i., 1 I I I , 4'i, A _ .1.: -i I : t A-., I I-------------

r- I I I I I-- pCUI HTO to 0 04 C)oto o 0 o 0 o o_ i to o to o 0 0 o 0 0 o 0 0 to to o 0 C.) C)o _Date tO 0)T)o o CD C')co_N~l o 0 o o 0 N 1 iz MWEXE-2.DOC j ..Page.15 of 5 I I