SAFEGUARDS INFORMATIONJune 15, 2006 EA 06-116EA 06-117Mr. Theodore SullivanSite Vice President - Vermont Yankee Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
SUBJECT:
ISSUANCE OF ORDERS FOR INTERIM SAFEGUARDS AND SECURITYCOMPENSATORY MEASURES AND FOR IMPLEMENTATION OF ADDITIONAL SECURITY MEASURES ASSOCIATED WITH ACCESSAUTHORIZATION FOR VERMONT YANKEE NUCLEAR POWER STATIONINDEPENDENT SPENT FUEL STORAGE INSTALLATION
Dear Mr. Thayer:
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued the enclosedOrders (Enclosures 1 and 3) which modify the general license for your independentspent fuel storage installation (ISFSI), to require compliance with the specified: interim compensatory measures (ICMs) for security and safeguards (Enclosure 2)(Attachment 1 to ); and additional security measures (ASMs) associated with access authorization (Enclosure 4)(Attachment 1 to Enclosure 3). Enclosure 5 is an NRC Regulatory InformationSummary regarding the NRC Threat Advisory and Protective Measures System for ISFSIs. Enclosures 2, 4, and 5 contain Safeguards Information (SGI). The Commission has determined that additional security measures are required, since theevents of September 11, 2001, and has concluded that the security measures should beembodied in Orders, consistent with the established regulatory framework. The requirementsof the enclosed Orders must be in place before first receipt of spent fuel and initial operations at your ISFSI.
SAFEGUARDS INFORMATIONWARNING: Violation of Section 147 of theAtomic Energy Act, "Safeguards Information,"is subject to Civil and Criminal Penalties.NOTICE: Upon removal of Enclosures 2, 4, and 5 to theLetter, this document and the enclosed Orders (Enclosures1 and 3) are DECONTROLLED.
SAFEGUARDS INFORMATIONT. Sullivan-2-The Orders do not obviate the need for licensees to continue to meet and maintain theeffectiveness of existing security measures taken in response to the events of September 11, 2001. The requirements will remain in effect until the Commission determines otherwise.The enclosed Orders call for responses and actions within specified time frames. With respectto the notices and submission required by Sections III.B and III.C of the Orders, for anyrequirement of the ICMs or ASMs (SGI attachments to the Orders) that requires an analysis or is contingent on completion of another requirement of the ICMs or ASMs, it will be a sufficientresponse if the licensee states in its 20-day submission:(1)That completion of the requirement depends upon completion of an analysis or otherrequirement;(2)The expected date of completion of the analysis or other requirement; and, (3)That, on such completion, the licensee will promptly submit the results of such analysis orinform NRC of the completion of the other requirement and the actions thereafterproposed, with respect to the requirement at issue, as well as the projected date ofcompletion.If Entergy Nuclear Vermont Yankee, LLC wishes to preserve its right to request a hearing onany requirement, contingent on completion of an analysis or other requirement, a request for an extension of time to request a hearing must be filed within 20 days of the date of these Orders, in accordance with Section IV of the Orders. Such a request may seek a reasonable period of time to request a hearing beyond the date that the staff informs the licensee whether theactions proposed and completion date for the requirement(s), contingent on an analysis or other requirement, are satisfactory.Please note that letters of response to Sections III.B and III.C of the Orders should beaddressed to the ATTN: Document Control Desk, Director, Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguards. Answers to the Orders should be addressed to the Secretary, Office of the Secretary of the Commission, as stated in Section IV of the Orders.Please contact Paul J. Kelley, Jr., at 301-415-6101, for the ICM Order, or Bradley Baxter, at 301-415-6742, for the ASM Order, in the Office of Nuclear Security and Incident Response; or Christopher M. Regan, at 301-415-1179, of my staff, to facilitate resolution of any issues relatedto compliance with the requirements in the enclosed Orders, or to facilitate answering any otherquestions you may have. The enclosed Orders have been forwarded to the Office of the Federal Register, for publication.
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATIONT. Sullivan-3-The material in Enclosures 2, 4, and 5 contains SGI, as defined by 10 CFR 73.21, and itsdisclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be made available electronically, for publicinspection, in the NRC Public Document Room, or from NRC's Agencywide Documents Accessand Management System, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.Sincerely,
/RA/
Jack R. Strosnider, DirectorOffice of Nuclear Material Safety and SafeguardsDocket No:72-59
Enclosures:
- 1. ICM Order
- 3. ASM Order
- 5. Regulatory Issue Summary 2002-12D (SGI)cc: w/Enclosures 1 and 3 only, see next page.
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATIONT. Sullivan-3-SAFEGUARDS INFORMATIONThe material in Enclosures 2, 4, and 5 contains SGI, as defined by 10 CFR 73.21, and itsdisclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be made available electronically, for publicinspection, in the NRC Public Document Room, or from NRC's Agencywide Documents Accessand Management System, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.Sincerely,/RA/
Jack R. Strosnider, Director Office of Nuclear Material Safety and SafeguardsDocket No: 72-59
Enclosures:
- 1. ICM Order
- 3. ASM Order
- 5. Regulatory Issue Summary 2002-12D (SGI)cc:w/Enclosures 1 and 3 only, see next page.
DISTRIBUTION
- NRC File CtrNMSS r/f NSIR r/f MBurrell, OERVirgilio, STPRLorson, RI/DRSOEWEBSFPO r/fPKelley, NSIR BMorency, NRRCAnderson, RI/DRPOEMAILDNS r/f BBaxter, NSIRMMiller, RI/NMSSRobert Price PKG ML061600398OFFICE:SFPOESFPO:LACTech EdSFPO:SCOEOGC NAME:CReganE. ZieglerEKrausM. WongMJohnsonJGoldberg DATE: 4/26 /06 4/27/06 5/8/06 4/28/06 5/4/065/12/06OFFICE:D:DNSSFPO:DDSFPO:DNMSS:D NAME:GTracyWRulandEBrachJStrosnider DATE: 5 /18 /06 6/9/06 6/9/06 6 / 15 /06C = COVERE = COVER & ENCLOSURE (non-SGI only)N = NO COPYOFFICIAL RECORD COPY