ML17324A575

From kanterella
Revision as of 13:36, 1 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
Date released: 05/31/2018 Download: ML17324A575


Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
ML17324A579
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/04/1985
From: CLIMER D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17324A579 (323)
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
ML17324A572
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/08/1986
From: ALEXICH M P
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML17324A572 (4)