the U. S. Nuclear Regulatory Commission Supplemental Letter on the Nuclear Energy Institute'S Letter, Avoiding Delays in Issuance of NRC Combined Licenses Due to Design Certification Errors Dated August 4, 2017
ML18031B302
Person / Time
Issue date: 02/28/2018
From: Akstulewicz F M
NRC/NRO/DNRL
To: Tschiltz M D
Nuclear Energy Institute
Hayes B
References
Download: ML18031B302 (8)


Text

Mr. Tschiltz 1

February 28, 2018 Mr. Michael D. Tschiltz, Senior Director New Plant, SMR & Advanced Reactors

Nuclear Energy Institute

1201 F Street, NW, Suite 1100 Washington, DC 20004

SUBJECT:

SUPPLEMENTAL RESPONSE RELATED TO THE NUCLEAR ENERGY INSTITUTE'S LETTER, "AVOIDING DELAYS IN ISSUANCE OF NRC COMBINED LICENSES DUE TO DESIGN CERTIFICATION ERRORS" DATED AUGUST 4, 2017

Dear Mr. Tschiltz:

The U.S. Nuclear Regulatory Commission (NRC) is providing a supplemental response to your letter (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17236A489) dated August 4, 2017. The NRC provided an initial response on October 31, 2017 (ADAMS Accession No. ML17291A793) which referenced a planned public meeting to discuss several options proposed by the Nuclear Energy Institute (NEI) related to avoiding delays in the issuance of combined licenses (COLs) due to design certification (DC) errors. The NRC staff reviewed the proposals and conducted a public meeting on December 13, 2017, which was summarized on January 25, 2018 (ADAMS Accession No. ML18011A037).

Both NRC and NEI acknowledged during the public meeting the substantive interchange on NEI's proposed approaches and additional potential approaches. A key recommendation from that meeting was that NEI prepare examples of the potential application of their proposed approaches to either past challenges or hypothetical situations in order to support additional efforts. Examples are important to further develop options and to evaluate implementation challenges of any option that is to move forwar

d. The NRC staff recommends that examples also be applied to any new proposed approaches that NEI would like to pursue further. If any new approach involves a potential rulemaking, the agency would follow its established processes in determining priority and in soliciting broader stakeholder input.

The NRC staff has agreed to meet with NE I once NEI has developed examples. Until a discussion of examples occurs, NRC will not be in a position to determine whether any option can be eliminated, although the NRC is providing some initial feedback on the options in the next paragraphs.

The NRC staff has planned a subsequent public m eeting on March 28, 2018, in which NEI will present examples of NEI's first proposed option involving a license condition using past challenges related to the AP1000 DC found in Title 10 Code of Federal Regulations (10 CFR)

Mr. Tschiltz 2

Part 52, "Licenses, Certifications, And Approvals For Nuclear Power Plants," Appendix D, "Design Certification Rule for the AP1000 Design." Examples for this option should meet the "ministerial act" standard from Commission case la w, where sufficient information is provided to support a safety finding at COL issuance without the need for a post-COL license amendment or similar NRC approval. For NEI's first proposed option, and for NEI's second proposed option to use inspections, tests, analyses, and acceptance criteria (ITAAC), examples should include discussion of any changes or additions needed to the final safety analysis report or Tier 2 of the design control document.

The NEI's third proposal involves a hybrid approach that would combine both a construction permit (CP) and a COL. The NRC staff has determined that NEI's proposed option is not consistent with current NRC regulations for issuance of COLs, which require a final safety finding on all matters material to licensing as defined by 10 CFR Part 52, Subpart C (e.g., 10 CFR 52.79(a), 52.97(a)). Since a final safety finding is also required under Section 185b. of the Atomic Energy Act of 1954, as amended (AEA), the NRC staff has determined that without a final safety finding, a license authorizing construction of a commercial nuclear reactor would have to be issued under Section 185a. of the AEA.

Any NEI correspondence received regarding this topic would not require a fee exemption request because it would be considered a continuation of an established dialogue that assists NRC in generic regulatory improvement efforts.

If you have any questions, please contact Barbara Hayes at (301) 415-7442 or via e-mail Barbara.Hayes@nrc.gov. Sincerely,

/RA/ Francis M. Akstulewicz, Director Division of New Reactor Licensing Office of New Reactors

cc: NEI New Reactors Mailing List

ML18031B302 *via e-mail NRO-002 OFFICE PM:NRO/DNRL/LB3 LA:NRO/DNRL/LB3BC:NRO/DNRL/LB3 NAME BHayes BAbeywickrama *JColaccino DATE 02/01/2018 02/01/201802/6/2018 OFFICE OGC D:NRO/DNRL NAME MSpencer* FAkstulewicz DATE 02/15/2018 02/28/2018 NEI New Reactors Mailing List (Revised 05/08/2017) cc:

Mr. Gary Wright, Director Division of Nuclear Facility Safety Illinois Emergency Management Agency 1035 Outer Park Drive Springfield, IL 62704

Page 1 of 5 NEI New Reactors Mailing List Email 4pareez@gmail.com Alan.Levin@areva.com (Alan Levin) alsterdis@tva.gov (Andrea Sterdis)

awc@nei.org (Anne W. Cottingham) awyche@bechtel.com (Altheia Wyche) bellesrj@ornl.gov (Randall Belles)

bendoj@asme.org (John Bendo) Betsy Langille (ealangille@tva.gov) bevans@enercon.com (Bob Evans) bevardbb@ornl.gov (Bruce Bevard)

Bojan.Petrovic@gatech.edu (Bojan Petrovic) brian.turner@oca.iowa.gov (Brian Turner) BSims@Becht.com (Robert Sims) bwwaites@southernco.com (Brandon Waites) carey.fleming@cenglic.com (Carey Fleming) ccmsc@verizon.net (Mike Callahan) cee@nei.org charles.bagnal@ge.com (Charles Bagnal) collinlj@westinghouse.com (Leslie Collins) cposlusny@babcock.com (Chester Poslusny)

CumminWE@Westinghouse.com (Edward W. Cummins)

curtisslaw@gmail.com (Jim Curtiss)

cwaltman@roe.com (C. Waltman) david.distel@exeloncorpo.com (David J. Distel) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) david.newland@cnsc-ccsn.gc.ca (David Newland)

dchapin@mpr.com (Douglas Chapin)

DeLaBarreR@state.gov (R. DeLaBarre) dianed@nirs.org (Dianed) dominiquef@nirs.org (Dominique French)

don.tormey@iub.iowa.gov

donald.woodlan@luminant.com (Donald Woodlan) dpstout@tva.gov (Daniel P. Stout) draleigh@curtisswright.com (Denna Raleigh) ecullington@earthlink.net (E. Cullington) ed.burns@earthlink.net (Ed Burns) eddie.grant@excelservices.com (Eddie Grant) elyman@ucsusa.org (Ed Lyman) erg-xl@cox.net (Eddie R. Grant) esmith@moenviron.org (Edward Smith) ewallace@nuscalepower.com (Ed Wallace)

F.Shahrokhi@areva.com (Farshid Shahrokhi)

fletcher@exchangemonitor.com

Page 2 of 5 NEI New Reactors Mailing List garent@tva.gov (Gordon Arent)

George_Stramback@Charter.net (George Stramback) ggeaney@mpr.com (George Geaney) GovePA@BV.com (Patrick Gove) gyoung4@entergy.com (Garry Young) hankwon.choi@wgint.com (Hankwon Choi) hickste@earthlink.net (Thomas Hicks) hwilchins@epsilonsystems.com (Howard Wilchins) jack.kasper@parsons.com (Jack Kasper) jahalfinger@babcock.com (Jeff Halfinger)

james1.beard@ge.com (James Beard)

james2.ross@ge.com (James Ross) jason.parker@pillsburylaw.com (Jason Parker) jennifer.easler@oca.iowa.gov (Jennifer Easler) jerald.head@ge.com (Jerald Head) jgutierrez@morganlewis.com (Jay M. Gutierrez)

Jim.Kinsey@inl.gov (James Kinsey)

jim.sundermeyer@iub.iowa.gov jmr@nei.org (Jeannie Rinckel) JNR@NuScalePower.com (Jose N. Reyes)

john.elnitsky@duke-energy.com (John Elnitsky) john.holt@nreca.coop (John Holt) john.oneill@pillsburylaw.com (John O'Neill)

Joseph_Hegner@dom.com (Joseph Hegner) jrappe@nuscalepower.com (Jodi Rappe) jwh@nei.org (Jerry Hiatt) jwh1@nreca.coop (John Holt) kahtan1234@yahoo.com KAK@nei.org (Kimberly Keithline) kerri.johannsen@iub.iowa.gov klingcl@westinghouse.com (Charles Kling) kouhestani@msn.com (Amir Kouhestani) kra@nei.org (Katie Austgen)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)

Kwelter@NuScalePower.com (Kent Welter) larry.stevens@iub.iowa.gov lchandler@morganlewis.com (Lawrence J. Chandler)

libby.jacobs@iub.iowa.gov mack.thompson@iub.iowa.gov marcel.deVos@cnsc-ccsn.gc.ca (Marcel DeVos) marilyn.kray@exeloncorp.com

mark.holbrook@inl.gov (Mark Holbrook) martha.shields@nuclear.energy.gov (Martha Shields)

media@nei.org (Scott Peterson)

Page 3 of 5 NEI New Reactors Mailing List mgiles@entergy.com (M. Giles) mirskys@saic.com (Steven Mirsky) MSF@nei.org (Marvin Fertel) murawski@newsobserver.com (John Murawski) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

P.Stefanovic@Holtec.com (Peter Stefanovic)

parveen.baig@iub.iowa.gov patriciaL.campbell@ge.com (Patricia L. Campbell) paul.gallagher@parsons.com (Paul Gallagher)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) pcarlone@mpr.com (Pete Carlone) peter@hastings-group.com (Peter Hastings) phg@nei.org (Paul Genoa)

PLorenzini@NuScalePower.com (Paul Lorenzini) poorewpiiI@ornl.gov (Willis P. Poore III) pshastings@tva.gov (Peter Hastings) ramana@Princeton.EDU (M. V. Ramana) rbarrett@astminc.com (Richard Barrett)

richard.sweigart@duke-eneergy.com (Richard Sweigart)

RJB@NEI.org (Russell Bell)

robert.haemer@pillsburylaw.com (Robert Haemer) robert.kitchen@duke-energy.com (Robert H. Kitchen) ronald.polle@oca.iowa.gov rritzman@firstenergycorp.com (R. Ritzman)

RSnuggerud@NuScalePower.com (Ross Snuggerud) rxm@nei.org (Rod McCullum) sabinski@suddenlink.net (Steve A. Bennett) sfrantz@morganlewis.com (Stephen P. Frantz) shobbs@enercon.com (Sam Hobbs) siciliatom@hotmail.com (Mark Campagne) stephen.markus@pillsburylaw.com (Stephen Markus) steven.hamrick@fpl.com (Steven Hamrick)

swender@FirstEnergyCorp.com (Samuel Wender IV) swkline@bechtel.com (Steve Kline) tedquinn@cox.net (Ted Quinn)

tgado@roe.com (Burns & Roe) timothy.beville@nuclear.energy.gov (Timothy Beville) tjhester@midamerican.com (Tom J. Hester) tjk@nei.org (T.J. Kim) troche@absconsulting.com (Thomas Roche) trsmith@winston.com (Tyson Smith)

Page 4 of 5 NEI New Reactors Mailing List Vanessa.quinn@dhs.gov (Vanessa Quinn) vince.gilbert@excelservices.com (Vince Gilbert) vka@nei.org (Victoria Anderson) wayne.marquino@gmail.com (Wayne Marquino)

whorin@winston.com (W. Horin) william.mcint.com (William Mctigue) wwbx@hyperionpowergeneration.com (Willis Bixby) x2gabeck@southernco.com (Gary Becker)

Page 5 of 5