05000443/FIN-2011002-02
From kanterella
Revision as of 15:06, 30 September 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Failure to Classify and Monitor the Ocean Transition Structures as In-Scope per 10cFR50.65(bX2) |
Description | Inspectors identified a non-cited violation of 10 CFR 50.65(bX2) because NextEra did not include certain Seabrook buildings as in-scope structures under the MR program. Specifically, NextEra did not classify the intake transition structure (lTS) and the discharge transition structure (DTS) as in-scope structures in the MR database, and as a result did not include them in the periodic inspections completed under the structures monitoring program per PEG04 from 1995 to 2009. NextEra initiated a MR scoping screening worksheet per procedure NAP 415 and upon consideration of the design basis information concluded both transition structures should be in-scope per 10 CFR 50.65(aX1). The NAP 415 scoping results were accepted by the MR Expert Panel on March 15,2011. NextEra initiated CR 1629504 to enter the issue into the Corrective Action Program (CAP) and determine the extent of condition. The performance deficiency is more than minor because if left uncorrected, given the indications of ASR identified in these concrete structures, not monitoring the ITS and DTS structures for degradation could result in the loss of function of structures supporting systems used to mitigate design basis events, used in the emergency operating procedures, or whose loss could result in a reactor trip. The inspectors performed a Phase 1 Significance Determination Process (SDP) screening, in accordance with NRC Inspection Manual Chapter (lMC) 0609, Attachment 4, and determined the issue was of very low safety significance (Green) because the finding was not a design or qualification deficiency, did not result in an actual loss of safety function, was not a loss of barrier function, and was not potentially risk significant for external events. This finding did not have a cross cutting aspect because the most significant contributor to the performance deficiency was not reflective of current licensee performance. |
Site: | Seabrook |
---|---|
Report | IR 05000443/2011002 Section 1R12 |
Date counted | Mar 31, 2011 (2011Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | T Moslak L Scholl W Raymond A Burritt J Johnson A Turilin J Deboer |
INPO aspect | |
' | |
Finding - Seabrook - IR 05000443/2011002 | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Seabrook) @ 2011Q1
Self-Identified List (Seabrook)
| |||||||||||||||||||