Pages that link to "ML20154J419"
Jump to navigation
Jump to search
The following pages link to ML20154J419:
Displayed 15 items.
- ML20247H447 (← links)
- ML20246N217 (← links)
- ML20246H538 (← links)
- ML20246G393 (← links)
- B12593, Special Rept:On 870612,during Installation of 10CFR50,App R Automatic Halon Fire Suppression Sys in Control Room,Control Room Smoke Detectors Rendered Inoperable.Caused by Removal of Ceiling to Facilitate Installation (← links)
- B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start (← links)
- B17017, Special Rept:On 980130,declared Meteorological Tower (Met) Delta - T Instrumentation Due to Discovery of Met Instrument Uncertainty Values Found Out of Compliance.Will Modify Meteorological Instrumentation Installed at Plant (← links)
- B17603, Special Rept:On 981212, Start of B-EDG Was Attempted from CR Following Completion of Heat Exchanger Insps.Caused by Trapped Air Pocket within Cw Loop.Performed OPs as Required in Order to re-vent Sys (← links)
- B17436, Special Rept:On 980809,at 1427 H with Plant in Mode 1,loose Parts Dectection Sys (Lpm) Was Declared Inoperable.Caused by Power Supply Unit to Signal Conditioning Unit for Lpm. Replaced Power Supply Units (← links)
- B16546, Special Rept:On 970615,Train B EDG Failed.Event Review Team Was Formed to Investigate & Evaluate Potential Cause of Oscillations (← links)
- B16141, Special Rept:On 961224,delayed Submittal of License Amend Request for Section 6.0, Administrative Controls, Occurred.Caused by Inadequate Communication.On 970122 Issued Expectations for Implementing Future Organizational Changes (← links)
- B15777, Special Rept:On 960528,Train B Emergency Diesel Generator Failed.Caused by Low Lube Oil Pressure.Instituted Procedural Changes Re Low Lube Oil Pressure During Strainer Swaps (← links)
- B14192, Special Rept:On 920601,Millstone Unit 2 Entered TS 3.3.3.3 When Seismic Monitoring Sys Removed from Service to Support SG Replacement Outage.Operations Personnel Instructed on Appropriate Actions Re Response to Monitor Alarm (← links)
- HL-2155, Special Rept 2-92-001:on 920311,discovered That Required Surveillance on Water Curtain Isolation Valve Missed Due to Less than Adequate Procedure & Personnel Error.Procedure 42SV-FPX-035-1S Revised & Surveillance Performed on 920311 (← links)
- B13840, RO Re Potential Failure of LPSI Sys Piping.Evaluation Involving Estimate of LPSI Piping Stress Upstream of LPSI Injection MOVs Performed.Reverse Flow Testing of LPSI Injection Check Valves Will Be Conducted by 1992 Outage (← links)