Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, G-191237, Rev. 12, HVAC - Flow Diagram Turbine, Service & Control Room Buildings. Sheet 2 | 19 March 2015 | Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, G-191237, Rev. 12, HVAC - Flow Diagram Turbine, Service & Control Room Buildings. Sheet 2 | |
BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, G-191237, Rev. 47, HVAC - Flow Diagram Turbine, Service & Control Room Buildings. Sheet 1 | 9 March 2015 | Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, G-191237, Rev. 47, HVAC - Flow Diagram Turbine, Service & Control Room Buildings. Sheet 1 | |
ML042330154 | 4 March 2004 | E-Mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, UFSAR Drawings | |
ML042330157 | 17 March 2004 | E-Mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, Fw E-mailings: VY-Pathways.pdf | |
ML060530380 | 15 August 2005 | Drawing LRA-33600-A-00217, Engineering Flow Diagram Turbine Bldg Area Off Gas Modification | |
ML060530385 | 15 November 2005 | Drawing LRA-5920-00870, HPCI Turbine Oil Piping Diagram | |
ML060530388 | 1 July 2005 | Drawing LRA-5920-4147, Schematic Air/Jacket Coolant System | |
ML060530393 | 1 July 2005 | Drawing LRA-5920-4150, Schematic Lube Oil System | |
ML060530396 | 29 March 2005 | Drawing LRA-G-191155, Piping and Instrument Symbols | |
ML060530401 | 15 August 2005 | Drawing LRA-G-191156, Flow Diagram Main, Extraction & Auxiliary Steam Systems | |
ML060530404 | 31 October 2005 | Drawing LRA-G-191159-SH-01, Flow Diagram Service Water System, Sheet 1 | |
ML060530406 | 1 November 2005 | Drawing LRA-G-191159-SH-02, Flow Diagram Service Water System, Sheet 2 | |
ML060530410 | 4 April 2005 | Drawing LRA-G-191159-SH-03, Flow Diagram Rcw Cooling Water System, Sheet 3 | |
ML060530411 | 4 April 2005 | Drawing LRA-G-191159-SH-05, Flow Diagram Recirculation Pump Cooling Water, Sheet 5 | |
ML060530414 | 15 August 2005 | Drawing LRA-G-191160-SH-03, Flow Diagram Instrument Air System, Sheet 3 | |
ML060530418 | 29 March 2005 | Drawing LRA-G-191160-SH-04, Flow Diagram Instrument Air System, Sheet 4 | |
ML060530425 | 15 August 2005 | Drawing LRA-G-191160-SH-05, Flow Diagram Service Air System, Sheet 5 | |
ML060530426 | 29 March 2005 | Drawing LRA-G-191160-SH-06, Flow Diagram Service Air Service, Sheet 6 | |
ML060530427 | 1 July 2005 | Drawing LRA-G-191160-07, Flow Diagram Diesel Generator Starting Air System, Sheet 7 | |
ML060530428 | 29 March 2005 | Drawing LRA-G-191169-SH-01, Flow Diagram High Pressure Coolant Injection System | |
ML060530429 | 29 March 2005 | Drawing LRA-G-191169-SH-02, Flow Diagram High Pressure Coolant Injection System | |
ML060530465 | 29 April 2005 | Drawing LRA-G-191170, Flow Diagram Control Rod Drive Hydraulic System | |
ML060530468 | 29 March 2005 | Drawing LRA-G-191171, Flow Diagram Standby Liquid Control System | |
ML060530471 | 31 October 2005 | Drawing LRA-G-191172, Flow Diagram Residual Heat Removal System | |
ML060530474 | 1 April 2005 | Drawing LRA-G-191173-SH-01, Flow Diagram Fuel Pool Cooling & Cleanup System, Sheet 1 | |
ML060530476 | 31 October 2005 | Drawing LRA-G-191173-SH-02, Flow Diagram Fuel Pool & Clean Up System, Sheet 2 | |
ML060530479 | 14 April 2005 | Drawing LRA-G-191174-SH-01, Flow Diagram Reactor Core Isolation Cooling System, Sheet 1 | |
ML060530482 | 14 April 2005 | Drawing LRA-G-191174-SH-02, Flow Diagram Reactor Core Isolation Cooling System, Sheet 2 | |
ML060530484 | 15 August 2005 | Drawing LRA-G-191175-SH-01, Flow Diagram Primary Containment & Atmosphere Control System, Sheet 1 | |
ML060530487 | 15 August 2005 | Drawing LRA-G-191175-SH-02, Nitrogen Supply System Flow Diagram, Sheet 2 | |
ML060530629 | 15 November 2005 | Drawing LRA-G-191160-SH-08, Flow Diagram Instrument Air System, Sheet 8 | |
ML060530632 | 29 March 2005 | Drawing LRA-G-191162-SH-02, Flow Diagram Miscellaneous Systems Fuel Oil, Sheet 2 | |
ML060530636 | 29 March 2005 | Drawing LRA-G-191163-SH-01, Flow Diagram Fire Protection System Inner Loop, Sheet 1 | |
ML060530641 | 29 March 2005 | Drawing LRA-G-191163-SH-02, Flow Diagram Fire Protection System Outer Loop, Sheet 2 | |
ML060530646 | 1 April 2005 | Drawing LRA-G-191163-SH-03, Flow Diagram Fire Protection System Low Pressure Co2, Sheet 3 | |
ML060530647 | 29 March 2005 | Drawing LRA-G-191163-SH-04, Control Room Bldg Cable Vault East & West Switchgear Rooms, Sheet 4 | |
ML060530650 | 15 November 2005 | Drawing LRA-G-191164, Flow Diagram Sampling System - Sheet 1 | |
ML060530654 | 29 March 2005 | Drawing LRA-G-191165, Flow Diagram Sampling System - Sheet 2 | |
ML060530656 | 21 November 2005 | Drawing LRA-G-191167, Flow Diagram Nuclear Boiler | |
ML060530657 | 15 November 2005 | Drawing LRA-G-191168, Flow Diagram Core Spray System | |
ML060530677 | 14 April 2005 | Drawing LRA-G-191176-SH-01, Flow Diagram Condensate & Demineralized Water Transfer System, Sheet 1 | |
ML060530678 | 15 August 2005 | Drawing LRA-G-191177-SH-01, Flow Diagram - Radwaste System, Sheet 1 | |
ML060530679 | 29 March 2005 | Drawing LRA-G-191178-SH-01, Flow Diagram Reactor Water Clean-Up System, Sheet 1 | |
ML060530680 | 29 March 2005 | Drawing LRA-G-191237-SH-01, HVAC - Flow Diagram Turbine, Service & Control Room Buildings, Sheet 1 | |
ML060530682 | 4 April 2005 | Drawing LRA-G-191237-SH-02, HVAC - Flow Diagram Turbine, Service & Control Room Buildings, Sheet 2 | |
ML060530683 | 4 April 2005 | Drawing LRA-G-191238, HVAC-Flow Diagram Reactor Building | |
ML060530684 | 29 March 2005 | Drawing LRA-G-191248, HVAC-Equipment Room Sheet No. 3 | |
ML060530685 | 29 March 2005 | Drawing LRA-G-191267-SH-01, Flow Diagram Nuclear Boiler Vessel Instrumentation, Sheet 1 | |
ML060530687 | 29 March 2005 | Drawing LRA-G-191267-SH-02, Flow Diagram Nuclear Boiler Vessel Instrumentation, Sheet 2 | |
ML060530688 | 15 August 2005 | Drawing LRA-VY-E-75-002, Engineering Flow Diagram Containment Atmosphere Dilution System (CAD) |