Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations | 13 October 2017 | Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations |
CNL-17-144, Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) | 20 December 2017 | Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) |
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | 10 October 2019 | License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) |
CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) | 27 July 2020 | Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) |
CNL-20-030, Response to Request for Additional Information to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | 29 April 2020 | Response to Request for Additional Information to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) |
CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | 23 March 2021 | Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) |
ML111530328 | 2 June 2011 | Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision |
ML11206A499 | 30 June 2011 | NUREG-0847 Supp 23, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2. |
ML11277A148 | 30 September 2011 | NUREG-0847 Supp 24 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2. |
ML120040451 | 15 December 2011 | Transcript of the ACRS Plant Operation and Fire Protection Subcommittee Meeting, December 15 2011, Pages 1-210 (Open) |
ML120461061 | 6 February 2012 | Minutes of the ACRS Plant Operations and Fire Proctection Subcommittee Meeting December 15, 2011 (Open) |
ML14245A386 | 29 August 2014 | NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014) |
ML16131A795 | 13 May 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 |
ML19197A093 | 16 July 2019 | Presentation Slides - Watts Bar Nuclear Plant (WBN) Unit 2, Pre-Submittal Meeting for License Amendment Request Measurement Uncertainty Recapture (Mur) Power Update |
ML20083J395 | 12 March 2020 | NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) |
ML20084M194 | 24 March 2020 | NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) |
ML20086G480 | 26 March 2020 | NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 |
ML20134J010 | 14 May 2020 | Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology |
ML20226A444 | 21 October 2020 | Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate |
NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 | 13 May 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 |
WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program | 16 April 2020 | Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program |
WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR) | 16 December 2020 | Revised Pressure and Temperature Limits Report (PTLR) |
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 11 May 2022 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual |
WBL-23-045, 10 CFR 50.59 Summary Report | 7 November 2023 | 10 CFR 50.59 Summary Report |
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 8 November 2023 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual |