Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
ML20138H89530 June 1985Rev 0 to Leak-Before-Break Evaluation of Reactor Coolant Loop, Final ReptABB IMPELL CORP. (FORMERLY IMPELL CORP.)
Grubb R
Bak W
Emerson R
ML20151J0536 June 1984Forwards Request for Addl Info Re Asymmetric LOCA Loads. Addl Info Needed in Order to Complete Safety Evaluation of plant-specific LOCA Analysis.Response Requested by 840731John Miller
Office of Nuclear Reactor Regulation
Withers B
Portland General Electric
ML20215N16731 October 1986Rev 1 to, Leak-Before-Break Evaluation of Reactor Coolant LoopABB IMPELL CORP. (FORMERLY IMPELL CORP.)
Emerson R
NRC Generic Letter 1989-2119 October 1989NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) RequirementsPartlow J
Office of Nuclear Reactor Regulation