Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000458/200500513 February 2006IR 05000458-05-005; on 10/01/2005 - 12/31/2005; River Bend Station; Licensed Operator Requalification, Operator Performance During Nonroutine Plant Evolutions, Permanent Plant Modifications
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
ML04299053923 September 2004RB-09-2004 - Final - Written Exam - SRO
ML06045020913 February 2006IR 05000458-05-005; on 10/01/2005 - 12/31/2005; River Bend Station; Licensed Operator Requalification, Operator Performance During Nonroutine Plant Evolutions, Permanent Plant Modifications
ML18284A37020 December 2018Renewed Facility Operating License NPF-47 Attachments and Appendices
ML19066A00829 April 2019Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3
ML20063A63014 January 1994Proposed Tech Specs Reflecting Removal of Component Lists
ML20066H09513 February 1991Proposed Tech Specs 3/4.4.3 Re Limiting Conditions for Operation & Surveillance Requirements for RCS Leakage & Leakage Detection Sys
ML20072T77311 April 1991Proposed Tech Specs Re Leakage Detection Sys & Operational Leakage
ML20116P1348 August 1996Technical Requirements Manual
ML20126K76719 July 1985Forwards Final Draft Tech Specs,Provided to Applicant to Assist in Reviews for Certification
ML20132H23025 July 1985Forwards Final Draft Tech Specs.Review & Confirmation That Draft Reflects FSAR & Summary Discussion of Long Term Changes Under Consideration Requested
ML20137N08930 August 1985Technical Specifications for River Bend Station.Docket No. 50-458. (Gulf States Utilities Company)
ML20138K30130 November 1985Technical Specifications for River Bend Station. Docket No. 50-458.(Gulf States Utilities Company)
ML20209E49721 May 1985Forwards Addl Final Draft Tech Specs W/Editorial Errors Not Identified by Util,Supplementing D Houston 850517 Memo
ML20212K41118 July 1985Requests Assistance in Investigating Allegation of Util Wrongdoing.D Houston Belief That Alleged Activities Occurred Based on Assessment of Util Performance Throughout Tech Spec Development Process.D Houston 850709 & 15 Memos Encl
ML20217J09521 April 1998Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7
ML21279A2316 October 2021Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement
NRC Generic Letter 1991-042 April 1991NRC Generic Letter 1991-004: Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle
RBG-22-457, Forwards Composite List of Requested Tech Spec Changes for Full Power Ol,Discussions,Justification & Proposed Markup for Each Change.No Change to License NPF-40 Requested5 November 1985Forwards Composite List of Requested Tech Spec Changes for Full Power Ol,Discussions,Justification & Proposed Markup for Each Change.No Change to License NPF-40 Requested
RBG-46179, Revisions to the Technical Requirements Manual and the Technical Specification Bases1 October 2003Revisions to the Technical Requirements Manual and the Technical Specification Bases
RBG-46419, Revisions to the Technical Requirements Manual and the Technical Specifications Bases8 April 2005Revisions to the Technical Requirements Manual and the Technical Specifications Bases
RBG-47135, License Amendment Request 2011-06, Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.11 April 2011License Amendment Request 2011-06, Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.
RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases25 July 2013Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases
RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)28 February 2018Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
RBG-47826, Request for Alternative in Accordance with 10 CFR 50.55a (g)(5)(iii) Proposed Alternative to 10 CFR 50.55a Examination Requirements for Pressure Retaining Welds in Control Rod Housings (RR-RBS-ISI-016)5 March 2018Request for Alternative in Accordance with 10 CFR 50.55a (g)(5)(iii) Proposed Alternative to 10 CFR 50.55a Examination Requirements for Pressure Retaining Welds in Control Rod Housings (RR-RBS-ISI-016)
RBG-47913, Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021)30 November 2018Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021)
RBG-47918, Removal of the Table of Contents from the Technical Specifications29 November 2018Removal of the Table of Contents from the Technical Specifications
RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b27 February 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b