Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000282/201000531 January 2011IR 05000282-10-005, 05000306-10-005, on 10/01/2010 - 12/31/2010, Prairie Island Nuclear Generating Plant, Units 1 and 2, Operability Evaluations, Event Follow-up and Other Activities
IR 05000282/202100411 February 2022Integrated Inspection Report 05000282/2021004 and 05000306/2021004
IR 05000282/202201126 September 2022Phase 4 Post-Approval Site Inspection for License Renewal Report 05000282/2022011 and 05000306/2022011
L-PI-09-086, NSPM Comments on NRC Safety Evaluation Report with Open Items Related to Renewal of Operating Licenses30 July 2009NSPM Comments on NRC Safety Evaluation Report with Open Items Related to Renewal of Operating Licenses
L-PI-09-133, License Amendment Request for Measurement Uncertainty Recapture - Power Uprate28 December 2009License Amendment Request for Measurement Uncertainty Recapture - Power Uprate
L-PI-16-049, Revision 34 to Updated Safety Analysis Report, Appendix L, Requirement of Renewed Operating Licenses3 June 2016Revision 34 to Updated Safety Analysis Report, Appendix L, Requirement of Renewed Operating Licenses
ML14245A38629 August 2014NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014)
ML23311A3577 November 2023Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0