Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000266/200300218 April 2003IR 05000266-03-002, IR 05000301-03-002, on 12/29/2002 Thru 03/31/2003, for Point Beach, Nuclear Management Co., LLC, DRP Integrated Inspection Report
ML05262038030 September 2005Fiscal Year 2005 Evaluation of the Operating Reactor Licensing Program
ML16251A1561 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control
ML21070A20715 March 2021License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application
ML21102A3482 April 2021Update to Final Safety Analysis Report, Chapter 7, Instrumentation and Control
NRC 2002-0030, License Amendment Request 226, Measurement Uncertainty Recapture Power Uprate30 April 2002License Amendment Request 226, Measurement Uncertainty Recapture Power Uprate
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control
NRC-2002-0094, Supplement to License Amendment Request 226, Measurement Uncertainty Recapture (Mur) Power Uprate23 October 2002Supplement to License Amendment Request 226, Measurement Uncertainty Recapture (Mur) Power Uprate