Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
05000305/FIN-2011003-05Failure to Review and Update Severe Accident Management Guidelines in Accordance with an Established Program
IR 05000305/201100328 July 2011IR 05000305-11-003, 4/01/2011 - 6/30/2011; Kewaunee Power Station; Maintenance Effectiveness, Operability Evaluations, and Identification and Resolution of Problems
IR 05000305/20110061 September 2011Mid-Cycle Letter for Kewaunee Power Station; 05000305-11-006
IR 05000305/201100913 May 2011IR 05000305-11-009, on 03/23/2011 - 04/29/2011, Kewaunee Power Station, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML0207206121 March 2002Submittal of Emergency Plan Implementing Procedures for Kewaunee Nuclear Power Plant
ML0215503599 May 2002Transmittal of Revised Kewaunee Nuclear Power Plant Emergency Response Plan Implementing Procedures EPIP-AD-05 (Rev D), EPIP-OSF-03 (Rev P), EPIP-TSC-04 (Rev N), EPIP-TSC-10 (Rev K), Form EPIPF-TSC-04-01 (Rev G). Form EPIPF-TSC-04-02 Will B
ML03232005611 August 2003Radiological Emergency Response Plan Implementing Procedures
ML05046022014 February 2005IR 05000305-04-009 on 10/01/2004 - 12/31/2004 for Kewaunee Nuclear Power Plant; Fire Protection, Refueling and Outage Activities, Identification and Resolution of Problems, Event Follow-up, Other Activities and Cross-Cutting Areas
ML0517405323 August 2005NPP - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reators.
ML0532604781 November 2005Enclosure G, Section 6, Emergency Measures, of the Kewaunee Emergency Plan, Appendix H, Evacuation Time Estimates, of the Kewaunee Emergency Plan & Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure, Determining Protective A
ML05333003315 December 2005Response to the U.S. Nuclear Regulatory Commission Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors
ML0721200032 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 Tac No. MD4543)
ML09216041313 April 20092009 Kewaunee Initial Examination Proposed Written Examination