Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ENS 55938 | Partial Loss of Power to RPS During Maintenance | |
ENS 57163 | Primary Containment Isolation Due to Loss of Rps Power Supply | |
GO2-10-121, Emergency Action Level Scheme Change to NEI 99-01, Rev. 5 Format | 25 August 2010 | Emergency Action Level Scheme Change to NEI 99-01, Rev. 5 Format |
GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License | 9 January 2012 | License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License |
GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 | 17 March 2015 | License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 |
IR 05000397/2002006 | 23 January 2003 | IR 05000397-02-006, on 12/2-12/10/2002, Energy Northwest, Columbia Generating Station, Supplemental Inspection for a White Finding and Baseline Inspection of the Identification and Resolution of Problems; Other |
IR 05000397/2004005 | 14 February 2005 | IR 05000397-04-005 on 12/31/2004 for Columbia Generating Station, Adverse Weather Protection, Personnel Performance During Nonroutine Evolutions, Surveillance Testing and Other |
IR 05000397/2005004 | 7 November 2005 | IR 05000397-05-004 on 06/24/05 - 09/23/05; Columbia Generating Station; Post Maintenance Testing, Other Activities |
IR 05000397/2014002 | 7 May 2014 | IR 05000397-14-002; 01/01/2014 - 03/23/2014; Columbia Generating Station; Adverse Weather Protection, Operability Determinations and Functionality Assessments |
IR 05000397/2017002 | 10 August 2017 | NRC Integrated Inspection Report 05000397/2017002 |
IR 05000397/2022002 | 28 July 2022 | and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000397/2022002 and 07200035/2022001 |
ML021420030 | 10 May 2002 | Part 1 of 2, Columbia Generating Station - Revised Plant Procedures Manual - Volume 13 |
ML022030019 | 2 July 2002 | Revised Emergency Plan Implementing Procedures, Including Rev 10 to 13.1.1A, Classifying Emergency - Technical Bases & Rev 16 to 13.5.1, Localized & Protected Area Evacuations. |
ML031270026 | 2 May 2003 | Plant Procedures Manual - Volume 13, Emergency Plan Implementing Procedures, Table of Contents Through Table 6 |
ML033140346 | 23 October 2003 | Plant Procedures Manual - Volume 13, Package No. 2003-738 |
ML11159A144 | 1 June 2011 | Response to Request for Additional Information Regarding Emergency Action Level Scheme Change |
ML12011A152 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML12011A159 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML12011A161 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML12011A163 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML12089A043 | 22 May 2012 | Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station. Columbia Lr Ltr to Applicant |
ML14010A293 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 1 - Introduction and General Description of Plant |
ML14010A300 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 5 - Reactor Coolant System and Connected Systems |
ML14010A302 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 7 - Instrumentation and Control Systems |
ML14010A304 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 9 - Auxiliary Systems |
ML14357A385 | 5 April 2004 | 4.5.04 - Transmittal of Revision 38 to the Columbia Generating Station Emergency Plan |
ML15355A489 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 1 - Introduction and General Description of Plant |
ML15355A507 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 7 - Instrumentation and Control Systems |
ML15355A509 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 9 - Auxiliary Systems |
ML17272A403 | 23 March 1979 | Forwards Amend 3 to FSAR |
ML17275B230 | 4 September 1981 | Forwards Responses to Containment Sys Branch 810316 Request for Addl Info.Responses Will Be Incorporated Into FSAR Amend within 4 Months.Remainder of Responses Re Hydrogen Recombiner Will Be Submitted to NRC by 810918 |
ML17276B082 | 5 February 1982 | Forwards Amend 21 to Fsar.Affidavit Will Be Furnished within 10 Days of Filing to Reflect Distribution of Amend,Per 10CFR2.101 |
ML17277A676 | 1 July 1983 | Forwards Rept on Safety Parameter Display Sys Safety Analysis,Per 830415 Commitment & Response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability. |
ML17277A974 | 31 October 1983 | Forwards Addl Info Re Emergency Classification Sys & Emergency Action Levels,Per NRC 831005 Request.Due to Plant Design,Not Possible to Quantify Primary Coolant Leakage in Excess of Tech Spec Limits |
ML17285A313 | 31 December 1988 | Annual Operating Rept 1988. W/890228 Ltr |
ML17285A641 | 31 July 1989 | Instrument Air Sys Review Response to Generic Ltr 88-14. W/Six Oversize Figures |
ML17286B021 | 20 August 1991 | Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Reflecting Causes of Operators Continued Inability to Respond to Severe Accident Conditions |
ML17291A446 | 13 October 1994 | Forwards WNP-2 Response to Request for Addl Info on Emergency Classification. |
ML17292A356 | 9 July 1996 | Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a |
ML17292A450 | 6 September 1996 | Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations |
ML17292A657 | 14 January 1997 | Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl |
ML17292A659 | 14 January 1997 | Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 |
ML17292A762 | 24 March 1997 | Rev 5 to TS Bases. |
ML17292B261 | 31 December 1997 | WNP-2 Annual Operating Rept for 1997. W/980226 Ltr |
ML17292B420 | 13 July 1998 | Forwards Rev 20 to WNP-2 Emergency Plan IAW 10CFR50.4(b), 50.54(q) & 10CFR50,App E.Detailed Synopsis of Changes,Encl. Changes Do Not Reduce Effectiveness of Plan |
ML17355A656 | 21 December 2017 | Technical Specification Bases |
ML17355A661 | 31 December 2017 | Amendment 64 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML17355A663 | 31 December 2017 | Amendment 64 to Final Safety Analysis Report, Chapter 4, Reactor |
ML17355A667 | 31 December 2017 | Amendment 64 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20065C663 | 30 September 1989 | Final Technical Evaluation Rept on Response from WPPSS to Generic Ltr 88-01 Pertaining to Washington Nuclear Plant 2 |