Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power31 May 2005License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power
GO2-12-152, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System25 October 2012Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System
GO2-13-043, Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System13 March 2013Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System
GO2-17-038, License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.23 October 2017License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
GO2-20-095, Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements24 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b4 October 2022Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML04154054519 May 2004Application for Amendment of Facility Operating for Extension of Diesel Generator Completion Time
ML05262041130 September 2004AST Amendment 9/30/04 - Attachments and Calculations
ML06100067214 April 2006License Amendment, Extends the Required Action Completion Times (CT) Specified in TS 3.8.1, AC Sources - Operating, to Restore an Inoperable DG to Operable Status from the Current 72 Hours to 14 Days
ML14127A40013 June 2014Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E Alternating Current Power Distribution System
ML17081A5339 March 20178-Columbia-2017-02 Final Written Exam
ML17081A5399 March 20173-COLUMBIA-2017-02 Draft Written Exam
ML17292A63212 December 1996Submits Proposed Mod to Amend Requests Revs a & B Re Overall Conversion of Current TS to Improved TS Based Upon NUREG-1434,rev 1
ML17292A65714 January 1997Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl
ML17292A76224 March 1997Rev 5 to TS Bases.
ML17355A65621 December 2017Technical Specification Bases
ML22165A2966 July 2022Regulatory Audit Agenda and Questions for License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML22241A01826 August 2022NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2