Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
ML19332E65628 November 1989Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Action Re USI A-17, Sys Interactions Expected to Be Completed by Oct 1992Exelon
Hunsader S
Murley T
Office of Nuclear Reactor Regulation
ML20108D24630 April 1996Nonproprietary Technical Justificaton for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Byron & Braidwood Units 1 & 2 Nuclear Power PlantsKaihwa Hsu
WESTINGHOUSE ELECTRIC COMPANY
DIV OF CBS CORP.
Vora V
Bhowmick D
ML20129H54630 June 1985Value Impact of Implementing Leak-Before-Break & Elimination of Associated Pipe Whip Restraint & Jet Deflectors on RCS Primary LoopExelon
ML20205E87428 October 1985Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation EnclThompson H
Office of Nuclear Reactor Regulation
Exelon
NRC Generic Letter 1989-2119 October 1989NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) RequirementsPartlow J
Office of Nuclear Reactor Regulation