Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleSiteProject stage
L-16-022, Steam Generator Inspection Reports - Fall 2015 Refueling Outage22 January 2016FirstEnergy
Richey M
Steam Generator Inspection Reports - Fall 2015 Refueling OutageBeaver ValleyRequest
L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.26 April 2016FirstEnergy
Richey M
Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2Beaver ValleyRequest
L-16-212, Response to Request for Additional Information Regarding 2015 Steam Generator Inspection Reports14 July 2016FirstEnergy
Richey M
Response to Request for Additional Information Regarding 2015 Steam Generator Inspection ReportsBeaver ValleyResponse to RAI
L-16-241, Updated Steam Generator Inspection Report - Fall 2015 Refueling Outage11 October 2016FirstEnergy
Richey M
Updated Steam Generator Inspection Report - Fall 2015 Refueling OutageBeaver ValleyOther
ML16147A28414 June 2016Taylor Lamb
Plant Licensing Branch I
Request for Additional Infomation Regarding Fall 2015 Refueling Steam Generator Tube InspectionsBeaver ValleyOther
ML16351A05423 December 2016Marshall M
Plant Licensing Branch I
Review of the Steam Generator Tube Inservice Inspection Reports for Refueling Outage 18Beaver ValleyApproval