Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleSiteProject stage
CNL-15-186, American Society of Mechanical Engineers Operation and Maintenance Code Relief Requests for Fourth Ten-Year Inservice Test Interval18 November 2015Tennessee Valley Authority
James Shea
American Society of Mechanical Engineers Operation and Maintenance Code Relief Requests for Fourth Ten-Year Inservice Test IntervalSequoyahRequest
ML15337A0512 December 2015Andrew Hon
Plant Licensing Branch II
NRR E-mail Capture - Accepted for Review - Sequoyah Nuclear Plant - ASME OM Code Relief Request for Fourth 10-Year ISISequoyahOther
ML16123A13112 May 2016Benjamin Beasley
Plant Licensing Branch II
Relief Requests RP-01, RP-02, RP-06, RP-08, and RV-01 Related to the Inservice Testing Program, Fourth 10-Year Interval (CAC Nos. MF7099 and MF7100)SequoyahOther