Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 1224 May 2013NextEra Energy
Kiley M
Inservice Inspection Plan Submittal of Relief Request No. 12Request
L-2013-288, Response to Request for Additional Information and Re-submittal of Relief Request No. 129 October 2013NextEra Energy
Kiley M
Response to Request for Additional Information and Re-submittal of Relief Request No. 12Response to RAI
ML13282A1859 September 2013Division of Operating Reactor Licensing
Farideh Saba
NRR E-mail Capture - RAIs for TACs MF1903-08 Regarding Relief Request #12RAI
ML13329A12514 January 2014Audrey Klett
Plant Licensing Branch II
SE for RR No. 12 for 4th 10-Year Inservice Inspection Intervals - System Leakage Test Boundaries of Class 1 Components (TAC Nos, MF1903, MF1904, MF1905, MF1906, MF1907, and MF1908)Other