Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML02144001224 May 2002Milano P
NRC/NRR/DLPM/LPD1
Summary of Telephone Conference with Entergy Nuclear Operations Response to Bulletin 2002-01, Indian Point Unit Nos. 2 and 3Other
ML02304028912 November 2002Milano P
NRC/NRR/DLPM/LPD1
Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Other
ML02325010821 November 2002Milano P
NRC/NRR/DLPM/LPD1
RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseRAI
NL-03-020, Response to Request for Additional Information Regarding 60-Day Response to NRC Bulletin 2002-0127 January 2003Entergy
Dacimo F
Response to Request for Additional Information Regarding 60-Day Response to NRC Bulletin 2002-01Response to RAI