Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20064C234 | 11 October 1978 | NORTHEAST UTILITIES Counsil W | Forwards Proposed Tech Specs to Require Diesel Generator Start Time of Less than or Equal to 20 | Other |
ML20207B633 | 9 November 1977 | Stolz J Office of Nuclear Reactor Regulation | Requests Determination If Throttle Valves Are Used to Obtain Required Flow Distribution in HPSI or LPSI Sys.If Throttle Valves Used,Tech Specs Should Be Changed within 60 Days to Incorporate Encl Surveillance Requirements | Other |
ML20207B635 | 28 April 1978 | Grimes B Eisenhut D Office of Nuclear Reactor Regulation | Discusses Listed Action Taken to Close Issue Re Necessary Tech Spec Changes to PWR Licenses to Incorporate Hpsi/Lpsi Sys Throttle Valves Surveillance Requirements.List of PWR Plants & Sample Generic SER Encl | Other |
ML20214S823 | 16 December 1977 | NORTHEAST UTILITIES Switzer D Northeast Nuclear Energy | Application for Amend to License DPR-65,revising Tech Specs Page 3/4 5-5 to Increase Min Requirement for Trisodium Phosphate Dodecahydrate in Item 4.5.2.c.3 | Request |
ML20214S827 | 31 December 1977 | Northeast Nuclear Energy | Proposed Tech Specs Pages 3/4 5-5,increasing Min Requirement for Trisodium Phosphate Dodecahydrate in Item 4.5.2.c.3 | Other |
ML20244A478 | 12 September 1978 | Counsil W Northeast Nuclear Energy | Responds to 780821 NRC Ltr Re Violation Noted in Inspec Rept 50-366/78-26.Does Not Consider Item to Be a Noncompliance. Corrective Action:Slight Setpoint Adjustment of Refueling Water-Low Instru Channels.(Encl to 7810060211) | Other |