Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
A06182, Responds to 861029 Request for util-proposed Tech Spec Changes Re Reporting of Safety Valve & Relief Valve Failure & Challenges,Control Room Habitability & Secondary Water Chemistry.Schedule for Submittal of Amend Requests Encl10 December 1986NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Responds to 861029 Request for util-proposed Tech Spec Changes Re Reporting of Safety Valve & Relief Valve Failure & Challenges,Control Room Habitability & Secondary Water Chemistry.Schedule for Submittal of Amend Requests EnclRequest
B12620, Proposed Tech Specs,Revising Page 6-19 to Add or Reclose to Requirements for Submittal of Annual Repts31 July 1987Northeast Nuclear EnergyProposed Tech Specs,Revising Page 6-19 to Add or Reclose to Requirements for Submittal of Annual ReptsOther
ML20077B85420 July 1983Overbeck G
FRANKLIN INSTITUTE
Delgaizo T
Delgazio T
Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation ReptOther
ML20214K56719 April 1983Office of Nuclear Reactor Regulation
Colburn T
Advises That Reporting Period Began on 800401 for All PWR Licensees Committed to Providing NRC Prompt Notification of Porv/Sv Failures & Periodic Repts.Project Managers Should Have Info Available in RecordsOther