Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 NameStart dateEnd date
CAC:MF07124 August 20174 August 2017
CAC:MF377215 December 201626 January 2017
CAC:MF38687 March 201611 October 2016
CAC:MF447923 December 20153 April 2019
CAC:MF458822 November 201622 November 2016
CAC:MF5026TSTF-37
TSTF-30
TSTF-45
TSTF-46
Clarify SR on Bypass of DG Automatic Trips
Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil
Modify Section 3.8 Mode Restriction Notes
Allow Administrative Means of Position Verification for Locked or Sealed Valves
Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration
Control Rod SCRAM Time Testing
3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS
SFDP Clarifications
Add Met Vs. Perform to Specification 1.4, Frequency
Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration
Determination of Cumulative and Projected Dose Contributions in Recp
Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions
Secondary Containment and Shield Building Boundary Integrity SRS
EFCV Completion Time to 72 Hours
Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO
Removing Restart of Shutdown Clock for Increasing Suppression Pool Temperature
Clarify the Control Rod Block Instrumentation Required Action
26 August 201621 June 2019
CAC:MF5579Generic Letter 2008-01, Managing Gas Accumulation28 October 201514 April 2016
CAC:MF60632 April 201515 June 2021
CAC:MF62384 May 201530 December 2015
CAC:MF64532 July 201518 December 2015
CAC:MF649428 December 201528 December 2015
CAC:MF6580Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B4 August 20157 March 2016
CAC:MF661111 August 201529 August 2017
CAC:MF66702 December 201514 March 2017
CAC:MF668129 January 201629 January 2016
CAC:MF698515 October 201530 September 2016
CAC:MF7197Technical Specifications End States, NEDC-32988-A11 April 201619 December 2016
CAC:MF74603 March 201616 March 2017
CAC:MF7466TSTF-6517 May 201613 January 2017
CAC:MF76926 May 201616 May 2016
CAC:MF7696Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR5 May 201624 August 2017
CAC:MF773617 June 201630 June 2016
CAC:MF783413 June 201813 June 2018
CAC:MF793213 April 201713 April 2017
CAC:MF8110Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B1 July 201630 November 2017
CAC:MF81416 July 201623 November 2016
CAC:MF81761 September 201630 June 2017
CAC:MF830929 August 20166 January 2017
CAC:MF889027 June 201727 June 2017
CAC:MF902226 October 201726 October 2017
CAC:MF902410 January 201729 March 2017
CAC:MF902727 December 201620 October 2017
CAC:MF90439 January 201715 February 2017
CAC:MF927117 February 201710 August 2017
CAC:MF935021 April 201721 April 2017
CAC:MF94357 November 201726 September 2018
CAC:MF95907 April 201722 January 2018
CAC:MF966220 April 201731 May 2018
CAC:MF975322 January 201822 January 2018
CAC:MF98125 June 201716 April 2018
CAC:MF985114 July 201714 July 2017
CAC:MF986813 March 201813 March 2018
CAC:MF99423 July 201713 April 2018
CAC:MF99443 July 201725 January 2018
CAC:MF999710 July 201729 August 2018
CAC:MG00713 August 201715 June 2018
CAC:MG018825 January 201826 July 2018
EPID:L-2017-LLA-0215TSTF-54214 September 201721 June 2019
EPID:L-2017-LRO-0054Financial Assurance Requirements for Decommissioning Nuclear Power Reactors30 March 20178 November 2017
EPID:L-2018-LEM-0047Revision to Technical Specification 3.6.4.1 -Secondary Containment17 October 201830 April 2019