Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNL-17-012, Organization Topical Report, TVA-NPOD89-A17 January 2017Organization Topical Report, TVA-NPOD89-AFire Protection Program
L-2008-150, Duane Arnold, and Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 227 June 2008Duane Arnold, and Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 2Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 429 June 2009Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2010-138, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 728 June 2010Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 7Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2013-208, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 131 July 2013Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 13Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2016-129, NextEra Energy Quality Assurance Topical Report (QATR FPL-1) Revision 19 Annual Submittal22 June 2016NextEra Energy Quality Assurance Topical Report (QATR FPL-1) Revision 19 Annual SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Post Accident Monitoring
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Safeguards Contingency Plan
License Renewal
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 1024 May 2021NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2021-234, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 27 Update15 December 2021NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 27 UpdateFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2022-082, NextEra Energy Seabrook, LLC, and NextEra Energy Point Beach, LLC, Quality Assurance Topical Report FPL-1, Revision 2823 May 2022NextEra Energy Seabrook, LLC, and NextEra Energy Point Beach, LLC, Quality Assurance Topical Report FPL-1, Revision 28Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal22 May 2023NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update15 December 2023Quality Assurance Topical Report (FPL-1) Revision 30 UpdateFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Commercial Grade
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal10 July 2024Quality Assurance Topical Report (FPL-1 Revision 31 Annual SubmittalCoatings
Nondestructive Examination
Aging Management
License Renewal
Commercial Grade
Fire Protection Program
Grace period
L-HU-04-039, Nuclear Management Company, Llc., Response to Request for Additional Information Request for Approval of Nuclear Management Company Quality Assurance Topical Report, Dated August 18, 200422 September 2004Nuclear Management Company, Llc., Response to Request for Additional Information Request for Approval of Nuclear Management Company Quality Assurance Topical Report, Dated August 18, 2004Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Commercial Grade
Fire Protection Program
ML03307016231 October 2003Table Comparing ANSI N18.7-1976 to ASME Nqa -1-1994 & NMC QATRShutdown Margin
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
ML03307016431 October 2003NQA-1 Vs Non-Programmatic ANSI Standards Comparison Tables
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.Anticipated operational occurrence
Probabilistic Risk Assessment
Fuel cladding
Coast down
ML04244039630 September 2002WCAP-15950, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Point Beach Units 1 and 2.
ML04309013930 September 2004WCAP-15950-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Point Beach Units 1 and 2.Non-Destructive Examination
Nondestructive Examination
Finite Element Analysis
Stress corrosion cracking
ML09125057128 February 2009WCAP-14788, Rev. 3, Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach 1 & 2, Power Uprate (1775 Mwt - Core Power with Feedwater Venturis, or 1800 Mwt - Core Power with LEFM on Feedwater Header)Power Uprate
NRC 2006-0089, License Amendment Request Number 247, Spent Fuel Pool Storage Criticality Control21 December 2006License Amendment Request Number 247, Spent Fuel Pool Storage Criticality ControlBoric Acid
Non-Destructive Examination
Hydrostatic
Aging Management
Spent Fuel Pool Instrumentation
License Renewal
Affidavit
Eddy-Current Testing