Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BSEP 12-0098, Enclosure 15 to BSEP 12-0098, Areva Report No. 51-9189034-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment18 October 2010Enclosure 15 to BSEP 12-0098, Areva Report No. 51-9189034-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D Methodology - Operability AssessmentSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
MELLLA
Operability Assessment
ML12251A14418 October 2010Enclosure 6 to BSEP 12-0098, Areva Report No. 51-9177317, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D MethodologyAnticipated operational occurrence
Minimum Critical Power Ratio
MELLLA
ML12251A14518 October 2010Enclosure 9 to BSEP 12-0098, Areva Report No. 51-9177315-001, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology - Operability AssessmentOperability Assessment
ML12251A14618 October 2010Enclosure 12 to BSEP 12-0098, Areva Report No. 51-9189033-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D MethodologyAnticipated operational occurrence
Minimum Critical Power Ratio
MELLLA
ML13071A63221 February 2010Monthly Operating Reports DataHigh winds
Packing leak
Internal Flooding
Reserve Station Service Transformer
Main transformer failure
Eddy Current Testing
Biofouling
Power change
Downpower
Coast down
Power Uprate
Overspeed trip
RA-18-0132, Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes13 August 2018Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment ChangesReactor Vessel Water Level
Overspeed trip
RA-22-0616, Revision to Brunswick Snubber Program Plan5 January 2023Revision to Brunswick Snubber Program PlanSafe Shutdown
Nondestructive Examination
Operability Determination
Earthquake