Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000424/200400323 April 2004IR 05000424-04-003 and IR 05000425-04-003 on 12/28/2003 - 03/27/2004 for Vogtle, Units 1 and 2; Routine Integrated Inspection Report and Notice of Enforcement of Discretion, (NOED) No. 03-6-004Fire Barrier
Enforcement Discretion
Temporary Modification
Significance Determination Process
Fire Protection Program
Power change
ML0331105877 November 2003Notice of Enforcement Discretion for Vogtle, Unit 2 Regarding 31-Day Staggered Test Basis Actuation Logic Tests, 11/07/03Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency