Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-97-323, Vehicle Barrier System.Sheet 49 | 28 November 1997 | Vehicle Barrier System.Sheet 49 | |
ML17212A217 | 11 June 1981 | Core Protection:Calculator No 1,Schematic. Revision Date Illegible | |
ML17212A218 | 11 June 1981 | Trip Unit Interconnection Module Wiring Diagram, as-built. Revision Date Illegible | |
ML17212A409 | 11 May 1981 | Auxiliary Feedwater Actuation System Simplified Functional Diagram. | |
ML17212A411 | 11 May 1981 | Auxiliary Feedwater Actuation System Testing System Diagram. | |
ML17212A413 | 11 May 1981 | Auxiliary Feedwater Actuation System Misc Diagrams. | |
ML17212A415 | 11 February 1981 | Flow Diagram:Feedwater,Condensate & Air Evacuation Systems, as-built | |
ML17212B601 | 14 April 1982 | Reactor Coolant Gas Vent System. | |
ML17212B674 | 21 March 1982 | Auxiliary One Line Diagram. | |
ML17212B676 | 18 March 1982 | Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 62 Ft. Sheet 1 | |
ML17212B677 | 18 March 1982 | Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 43 Ft. Sheet 2 | |
ML17212B678 | 18 March 1982 | Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 19.50 Ft. Sheet 3 | |
ML17212B679 | 18 March 1982 | Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 0.50. Sheet 4 | |
ML17212B680 | 17 June 1977 | Yard Duct Runs and Lighting Plan,Sections and Details. Sheet 1 | |
ML17212B681 | 9 May 1979 | Cable Tray Arrangement:Key Plan. | |
ML17212B682 | 26 July 1979 | Intake Structure Conduit and Lighting. | |
ML17212B683 | 9 May 1979 | Cable Vault Trays Plan & Sections. Sheet 1 | |
ML17212B684 | 30 October 1981 | Reactor Auxiliary Building El 19 Ft 6 Inches Conduit,Trays & Grounding. Sheet 2 | |
ML17212B685 | 24 April 1981 | Reactor Auxiliary Building:El 0.50 Ft Conduit,Trays and Grounding. Sheet 1 | |
ML17212B686 | 24 July 1978 | Reactor Auxiliary Bldg El 0.50 Ft Conduit Trays & Grounding. Sheet 2 | Boric Acid |
ML17212B687 | 24 March 1981 | Reactor Auxiliary Building El 43 Ft & 62 Ft Conduit,Trays & Grounding. Sheet 1 | |
ML17213A600 | 16 November 1979 | Reactor Auxiliary Bldg Block Walls. Sheet 1 | |
ML17213A601 | 16 November 1979 | React Aux Bldgs Block Walls. Sheet 2 | |
ML17213A881 | 22 February 1982 | Piping & Instrumentation Diagram, as-built | |
ML17213A883 | 7 January 1982 | Flow Diagram:Post-Accident Sampling System. Sheet 1 of 1 | |
ML17213A885 | 31 March 1981 | Flow Diagram:Hydrogen Sampling. | |
ML17213A934 | 20 September 1982 | Psl Emergency Operations Facility:Site Plan. Sheet 1 of 19 | |
ML17213A936 | 20 September 1982 | Psl Emergency Operations Facility:Floor Plan & Details. Sheet 5 | |
ML17213B143 | 17 January 1973 | Arrgt:Control Room Panel 104. Sheet 2 | |
ML17213B144 | 7 February 1973 | Arrgt:Control Room Panel 103. Sheet 2 | |
ML17213B145 | 1 September 1982 | Incore Cet/Spnd Wiring Diagram Channel B. Sheet 1 of 6 | |
ML17213B146 | 1 September 1982 | Incore Cet/Spnd Wiring Diagram Channel A. Sheet 1 of 6 | |
ML17213B147 | 12 October 1982 | Flexible Hjtc Probe Assy. Sheet 1 of 2 | |
ML17213B336 | 22 March 1983 | Site Plan:Fire Protection Appendix R Fire Areas. Sheet 1 | |
ML17213B337 | 23 February 1983 | Reactor Auxiliary Building Fire Protection - Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 62 Ft. Sheet 2 | |
ML17213B338 | 23 February 1983 | Reactor Auxiliary Building Fire Protection - Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 43 Ft. Sheet 3 | |
ML17213B339 | 23 February 1983 | Reactor Auxiliary Building Fire Protection - Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 19.50 Ft. Sheet 4 | |
ML17213B340 | 23 February 1983 | Reactor Auxiliary Building Fire Protection - Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El .50 Ft. Sheet 5 | |
ML17214A313 | 13 October 1971 | Assy of Nuclear Class Butterfly Valve. | |
ML17214A314 | 11 July 1973 | General Arrangement:Spring Opposed Cylinder Operated Nuclear Class Butterfly Valve. | |
ML17214A443 | 16 September 1983 | Final NDE Post Lug Removal. Actual Drawing NUMBER:SE-19367-160-087 | |
ML17214A624 | 20 June 1983 | Reactor Auxiliary Building Fire Detection System Conduit Layout El 0.5 Ft. Sheet 1 | |
ML17214A628 | 12 April 1983 | Reactor Auxiliary Building Fire Detection System Conduit Layout - El 19 Ft 6 Inches. Sheet 2 | |
ML17214A631 | 12 April 1983 | Reactor Auxiliary Building Fire Detection System Conduit Layout El 43 Ft. Sheet 3 | |
ML17214A632 | 15 December 1982 | Reactor Auxiliary Building Fire Detection System Conduit Layout Cable Vault & Below El 28 Ft 8 Inches. Sheet 4 | |
ML17214A633 | 6 October 1982 | Fuel Handling Building Fire Detection System Conduit Layout. Sheet 5 | |
ML17214A634 | 23 March 1983 | Outlying Areas Fire Detection System Conduit Layout. Sheet 6 | |
ML17214A635 | 20 June 1983 | Reactor Auxiliary Building Fire Detection System Conduit Layout El 62 Ft. Sheet 7 | Backfit |
ML17214A636 | 12 April 1983 | Reactor Auxiliary Building Fire Detection System Conduit Layout Misc Areas. Sheet 8 | |
ML17214A637 | 15 December 1982 | Reactor Containment Building Fire Detection System Conduit Layout El 18 Ft. Sheet 11 |