Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications13 December 2011Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff QualificationsSafe Shutdown
High Radiation Area
Process Control Program
Fire Protection Program
CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)30 March 2016Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Decommissioning Funding Plan
Exemption Request
CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)29 March 2018Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Incorporated by reference
Decommissioning Funding Plan
Exemption Request
CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc28 March 2019Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, IncDecommissioning Funding Plan
Exemption Request
ENOC-07-00007, Status of Decommissioning Funding for Year Ending December 31. 2006 - 10 CFR 50.75(f)(1)29 March 2007Status of Decommissioning Funding for Year Ending December 31. 2006 - 10 CFR 50.75(f)(1)
ENOC-08-00018, Stations - Decommissioning Fund Status Report for the Period Ending December 31, 200726 March 2008Stations - Decommissioning Fund Status Report for the Period Ending December 31, 2007
ENOC-09-00007, Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1)30 March 2009Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1)
ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 200931 March 2010Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009License Renewal
ENOC-12-00039, ISFSI Decommissioning Funding Plans (10 CFR 72.30)13 December 2012ISFSI Decommissioning Funding Plans (10 CFR 72.30)Decommissioning Funding Plan
License Renewal
ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc29 March 2013Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc
ENOC-15-00005, Decommissioning Funding Status Report Entergy Nuclear Operations, Inc30 March 2015Decommissioning Funding Status Report Entergy Nuclear Operations, Inc
IR 05000293/195700112 June 2024640304-Amendment 10 License 50-29357-01/030-38077 for Providence Imaging Center (PIC)
IR 05000293/19820013 January 2020David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184
L-20-023, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations31 March 2020Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations
L-21-037, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations31 March 2021Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations17 December 2021and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.25 March 2022and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.Decommissioning Funding Plan
L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations31 March 2023Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)23 May 2023Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point13 November 2023Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point
ML03064043228 March 2003License Amendment 197, Change to Applicability of Pressure-Temperature Curves
ML03113048717 April 2003Supplement to Request for Amendment to Technical Specifications Associated with Emergency Core Cooling System Requirements During Shutdown Conditions
ML07037041329 January 2007License Renewal Application Amendment 13High Radiation Area
Nondestructive Examination
Aging Management
EVT-1
Fire Protection Program
ML08217067216 July 2008Report, E11-5690-003, Preliminary Decommissioning Cost Analysis for the Pilgrim Nuclear Power Station.Feedwater Heater
License Renewal
Fuel cladding
Scaffolding
ML11123A12221 April 2011(PNPS) License Renewal Application (LRA) Supplemental InformationCoatings
Aging Management
License Renewal
ML11147A03430 June 2011Supplemental Safety Evaluation Report Related to the License Renewal Pilgrim Nuclear Power StationNon-Destructive Examination
Coatings
Nondestructive Examination
Aging Management
License Renewal
EVT-1
Fire Protection Program
Thermal fatigue
ML12093A38230 March 2012Status of Decommissioning Funding for Year Ending December 31, 2011
ML12165A60720 June 2012Nrc'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1,2, and 3 (TAC Nos. ME8371, Me 8372, and ME8373)
ML21054A13214 April 2021U.S. NRC Analysis of Entergy Nuclear Operations, Inc'S Initial and Updated Decommissioning Funding Plans for the Big Rock Point, Indian Point, Pilgrim, Palisades, Fitzpatrick, and Vermont Yankee Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
License Renewal