Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Start dateStatusTitleRequest typeEstimated NRC review hoursTopic
CAC:MF076828 August 2015Approved
Closed
CAC:MF378613 December 2016Approved
Closed
CAC:MF62484 November 2013Approved
Closed
CAC:MF63512 May 2016Approved
Closed
CAC:MF64487 July 2015Withdrawn
Closed
CAC:MF74353 March 2016Approved
Closed
CAC:MF75545 May 2016Approved
Closed
CAC:MF810129 July 2016Approved
Closed
CAC:MF829722 August 2016Approved
Closed
CAC:MF87969 November 2016Approved
Closed
CAC:MF895023 January 2017Approved
Closed
220 hours9.167 days <br />1.31 weeks <br />0.301 months <br />
CAC:MF952326 April 2017Approved
Closed
80 hours3.333 days <br />0.476 weeks <br />0.11 months <br />
CAC:MF987629 June 2017Approved
Closed
80 hours3.333 days <br />0.476 weeks <br />0.11 months <br />
CAC:MG00214 January 2017Approved
Closed
200 hours8.333 days <br />1.19 weeks <br />0.274 months <br />
CAC:MG019831 August 2017Approved
Closed
350 hours14.583 days <br />2.083 weeks <br />0.479 months <br />
EPID:L-2017-LLA-03691 November 2017Approved
Closed
License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required ModificationsLicense Amendment100 hours4.167 days <br />0.595 weeks <br />0.137 months <br />
EPID:L-2018-LLA-01533 July 2018Approved
Closed
License Amendment525 hours21.875 days <br />3.125 weeks <br />0.719 months <br />
EPID:L-2018-LLA-02588 November 2018Withdrawn
Closed
TSTF-425License Amendment
EPID:L-2018-LLA-02961 November 2018Approved
Closed
License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 ModificationsLicense Amendment
EPID:L-2019-LLA-007027 September 2018Approved
Closed
TSTF-425License Amendment
EPID:L-2019-LRO-003325 July 2019Approved
Closed
LRO
EPID:L-2020-LLE-015530 September 2020Approved
Closed
Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 PandemicExemption Request
EPID:L-2020-LLE-019012 November 2020Approved
Closed
Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 PandemicExemption Request
EPID:L-2020-LLE-024027 January 2021Approved
Closed
Indian Point Nuclear Generating, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Exemption Request
EPID:L-2020-LLM-00002 December 2019Approved
Closed
Firstenergy Nuclear Operating Company - Letter, Order, SE Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley, Units 1 and 2, Davis-Besse, Unit 1, and Perry, Unit 1License Transfer
EPID:L-2020-LLM-000323 December 2020Approved
Closed
Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear PlantLicense Transfer
EPID:L-2020-LLR-012821 July 2020Approved
Closed
ASME Code Case N-729-4Relief Request
EPID:L-2021-LLA-00991 June 2021Approved
Closed
TSTF-448
TSTF-425
TSTF-545
License Amendment
EPID:L-2021-LLE-003326 March 2020Approved
Closed
Units 1, 2, and 3; and Palisades - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Exemption Request
EPID:L-2021-LLL-001521 July 2021Withdrawn
Closed
EA-02-026LLL
EPID:L-2021-LRO-001425 March 2021Approved
Closed
2020 Steam Generator Tube Inspection ReportLRO
EPID:L-2023-LLL-000418 January 2023Approved
Closed
Quality Assurance Program Manual Reduction in CommitmentLLL
TAC:540099 January 1987Approved
Closed
TAC:6511811 May 1987Approved
Closed
TAC:L2388730 September 2005Approved
Closed
TAC:M6946825 September 1998Approved
Closed
TAC:M8154731 March 1992Approved
Closed
TAC:M9812218 April 1997Approved
Closed
TAC:MB136226 February 2002Approved
Closed
TAC:MB332610 April 2002Approved
Closed
TAC:MB412525 February 2002Approved
Closed
TAC:MB428126 November 2002Withdrawn
Closed
TAC:MB456228 May 2002Approved
Closed
TAC:MB581929 May 2003Withdrawn
Closed
TAC:MB779110 December 2003Approved
Closed
TAC:MB875515 December 2003Approved
Closed
TAC:MB893528 August 2003Approved
Closed
TAC:MB900228 February 2005Approved
Closed
TAC:MB928825 September 2003Approved
Closed
TAC:MB942425 September 2003Approved
Closed