Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML17071A00223 March 201703/23/2017 Forthcoming Closed Audit for the WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0Request
ML17071A00323 March 2017Ekaterina Lenning
Licensing Processes Branch (DPR)
03/23/2017 Notice of Forthcoming Closed Audit for the WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlations: D5 for SVEA-96 Optima3.Other
ML17079A24623 March 2017Ekaterina LenningNon-Prop Attachment 1 to the Closed Audit Notice for Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 OpOther
ML18318A0519 January 2019Supplemental Information for the December 4-5 2018 Closed Audit of WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlations: D5 for SVEA-96 Optima3Request
ML18323A0749 January 2019Ekaterina Lenning
Division of Licensing Projects
Cover Letter Supplemental Information of the December 4-5 2018 Closed Audit for WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlations: D5 for SVEA-96 Optima3Other
ML18361A5839 January 2019Ekaterina Lenning
Licensing Processes Branch
Non-Prop Enclosure 1 Supplemental Information for the December 4-5 2018 Closed Audit for WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlations: D5 for SVEA-96 Optima3Other