Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
DCL-13-024, Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 27 March 2013Pacific Gas & Electric
Allen B
Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 2Supplement
ML13078A2915 March 2013AREVA NP
Riordan T
Areva Calculation #32-9200291-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzles (Non-Proprietary)Request
ML13081A07411 April 2013Polickoski J
Plant Licensing Branch IV
Summary Conference Call Between Pacific and Electric Co., and NRC Regarding Verbal Authorization of Relief Request Rep-1 U2, Revision 2Other
ML13170A19611 July 2013Polickoski J
Plant Licensing Branch IV
Request for Withholding Information from Public Disclosure - 3/5/2013 Affidavit Executed by G. Elliott, Areva Np Inc., Regarding Areva Calculations Provided for Relief Request REP-1 U2, Revision 2Withholding Request Acceptance
ML13232A30828 August 2013Markley M
Plant Licensing Branch IV
Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection IntervalOther