Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML12234A46028 August 2012Beltz T
Plant Licensing Branch III
Request for Additional Information Regarding the Fall 2011 Steam Generator Tube Inservice Inspection ReportRAI
ML12361A1347 January 2013Beltz T
Plant Licensing Branch III
Review of the Fall 2011 Refueling Outage Steam Generator Tube Inservice Inspection ResultsApproval
NRC 2012-0015, Fall 2011 Unit 1 (U1R33) Steam Generator Tube Inspection Report29 May 2012Point Beach
Jim Costedio
Fall 2011 Unit 1 (U1R33) Steam Generator Tube Inspection ReportRequest
NRC 2012-0076, Response to Request for Additional Information Fall 2011 Unit I (U1 R33) Steam Generator Tube Inspection Report25 September 2012Point Beach
Jim Costedio
Response to Request for Additional Information Fall 2011 Unit I (U1 R33) Steam Generator Tube Inspection ReportResponse to RAI