Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML05305038620 October 2005Tennessee Valley Authority
Pace P
Cycle 13 (U1C13) 12-Month Steam Generator Inspection ReportRequest
ML06004016513 January 2006Pickett D
Plant Licensing Branch III-2
RAI, the Cycle 13 Steam Generator Tube Inservice InspectionsRAI
ML06054048322 February 2006Tennessee Valley Authority
Pace P
Response to Request for Additional Information Regarding Unit 1 Steam Generator (SG) Reports from Cycle 13 Refueling OutageResponse to RAI
ML0609505101 May 2006Pickett D
Plant Licensing Branch III-2
Summary of the Staff'S Review of the Steam Generator Tube Inservice Inspection Reports for the End-of-Cycle 13 Refueling Outage in 2004Approval