Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML0228001987 October 2002NRC/NRR/DSSA/SPSB
Reinhart F
Evaluation of Risk Assessment Information Provided by Beaver Valley Power Station in Support of Request to Extend Completion Time for ECCS Accumulators from 1 Hour to 24 HoursOther
ML03056065725 February 2003NRC/NRR/DLPM/LPD1
Colburn T
Licensing Amendment, Issuance of Amendment Revisions to Allows Outage Times of Emergency Core Cooling System AccumulatorsApproval