Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20197H2078 June 1984Xcel Energy
Warembourg D
Discusses Program for Cleanup of Reactor Bldg Keyway,Turbine Bldg,Access Bay & Refueling Bay.Program Underway on Levels 1,2 & 3 of Reactor Bldg & Level 5 of Turbine Bldg.Program Scheduled for Completion 841231Other
ML20202C59325 May 1984NRC
Eisenhut D
Partially Withheld Request for Rept That Includes Allegation That Main Steam Line Forced in Place & Welding Procedures Performed.Rept Due within 2 Wks.Related Info EnclOther