Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20073R33522 April 1983Southern Nuclear
Beckham J
Application to Amend Licenses DPR-57 & NPF-5,revising Tech Specs Re TMI Action Plan Items I.A.1.1.3,I.A.1.3,II.E.4.1, II.E.4.2.5-7,II.K.3.3,II.K.3.13,II.K.3.22,II.K.3.15, II.K.3.19,II.K.3.27,II.K.3.45 & II.F.1-4Request
ML20073R35822 April 1983Southern NuclearRevised Tech Specs Re TMI Action Plan Items I.A.1.1.3, I.A.1.3,II.E.4.1,II.E.4.2.5-7,II.K.3.3,II.K.3.13,II.K.3.22, II.K.3.15,II.K.3.19,II.K.3.27,II.K.3.45 & II.F.1-4Other
ML20076K7059 September 1983Southern Nuclear
Causey J
Application for Amend to License NPF-5,proposing Tech Spec Changes to Reflect Implementation of TMI Action Plan Item II.K.3.22, RCIC Suction Automatic Transfer, as Required by Generic Ltr 83-02Request
ML20076K7199 September 1983Southern NuclearProposed Tech Spec Changes to Reflect Implementation of TMI Action Plan Item II.K.3.22, RCIC Suction Automatic TransferOther
ML20081C50824 October 1983Southern Nuclear
Gucwa L
Notifies of Possible Problem Re 10CFR50.49 Equipment Qualification Deadline for Electrical Components of HPCI Control Sys.Problems First Discovered on 830825.Extension of Rulemaking Deadline May Be Requested.Util Awaiting DataOther
ML20081C65024 October 1983Southern Nuclear
Gucwa L
Clarification to 830929 Application to Amend License DPR-57, Revising Tech Specs to Support Planned Shutdown for Core ReconstitutionSupplement