Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20207B6339 November 1977Stolz J
Office of Nuclear Reactor Regulation
Requests Determination If Throttle Valves Are Used to Obtain Required Flow Distribution in HPSI or LPSI Sys.If Throttle Valves Used,Tech Specs Should Be Changed within 60 Days to Incorporate Encl Surveillance RequirementsOther
ML20207B63528 April 1978Grimes B
Eisenhut D
Office of Nuclear Reactor Regulation
Discusses Listed Action Taken to Close Issue Re Necessary Tech Spec Changes to PWR Licenses to Incorporate Hpsi/Lpsi Sys Throttle Valves Surveillance Requirements.List of PWR Plants & Sample Generic SER EnclOther