Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
GO2-19-129, Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets3 September 2019Energy Northwest
Dittmer J
Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies BucketsRequest
GO2-20-014, 2019 Annual Radioactive Effluent Release Report15 April 2020Energy Northwest
Schuetz R
2019 Annual Radioactive Effluent Release ReportRequest
GO2-20-071, Response to Request for Additional Information Related to Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems23 April 2020Energy Northwest
Schuetz R
Response to Request for Additional Information Related to Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution SystemsResponse to RAI
ML20114E19413 May 2020Klos L
Plant Licensing Branch IV
Letter/Public Notice of Application for Renewed Facility Operating License Exigent License Amendment Request for a One-Time Change to Completion Times for Inoperable Electrical Distribution SystemsOther
ML20118C19013 May 2020Klos L
Plant Licensing Branch IV
Public Notice of Application for Renewed Facility Operating License an Exigent License Amendment Request for a One-Time Change to Completion Times for Inoperable Electrical Distribution SystemsOther
ML20125A08012 May 2020Klos L
Plant Licensing Branch IV
Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances)Approval