Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
L-19-265, License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance18 December 2019FirstEnergy
Payne F
License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing ComplianceRequest
ML20007F8067 January 2020Scott Wall
NRC/NRR/DORL/LPL3
NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Requested Licensing Action Amendment to Modify the NDE Inspection Interval for Special Heavy Lifting DevicesAcceptance Review
ML20118C16722 May 2020Scott Wall
Plant Licensing Branch III
Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination FrequencyApproval