Semantic search

Jump to navigation Jump to search
 NameStart dateEnd date
EPID:L-2020-LLA-0248Riv Column 1 EOC 2020 Public Meeting Summary4 November 20202 September 2021
EPID:L-2020-LLA-024918 December 20203 September 2021
EPID:L-2020-LLR-0134Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI1 October 202030 October 2020
EPID:L-2020-LRM-009923 October 202030 November 2020
EPID:L-2020-LRM-01045 November 20201 December 2020
EPID:L-2020-NFG-0002Email-Request for Review and Endorsement of NEI 21-06 Guidelines for 10 CFR 50.59 Implementation at Non-Power Production or Utilization Facilities.Msg23 August 202112 October 2021
EPID:L-2021-LLA-00891 July 202118 May 2022
EPID:L-2021-LLA-0152TSTF-56712 August 202122 October 2021
EPID:L-2021-LLA-0172License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation7 June 202123 February 2022
EPID:L-2021-LLA-0173License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating29 September 20214 November 2022
EPID:L-2021-LLE-0036Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)10 November 202025 August 2021
EPID:L-2021-LRM-006430 June 202121 July 2021
EPID:L-2021-LRM-011829 November 202111 January 2022
EPID:L-2021-LRO-0060Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage1 November 20215 May 2022
EPID:L-2021-NFO-000311 May 202111 May 2021
EPID:L-2021-SPR-00052 September 20212 September 2021
EPID:L-2022-LLA-0008Removal of the Table of Contents from the Technical Specifications12 January 202216 August 2022
EPID:L-2022-LLA-0107License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2 August 202227 December 2022
EPID:L-2022-LLA-0191TSTF-55415 December 202225 January 2023
EPID:L-2022-LLR-0039Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .4 April 202210 June 2022
EPID:L-2022-LLR-0043CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads6 April 20222 June 2022
EPID:L-2022-LRO-012521 March 202321 March 2023
EPID:L-2022-NTR-0002
EPID:L-2023-LLA-0032License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications1 March 202331 March 2023
EPID:L-2023-LLA-0144
EPID:L-2023-LLA-0164
EPID:L-2023-LLE-002214 September 202314 September 2023
EPID:L-2023-LLE-0048
EPID:L-2023-LLR-001010 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened16 March 202331 March 2023
EPID:L-2023-LLR-0026CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components17 May 202326 June 2023
EPID:L-2023-LRM-0076TSTF-5055 October 202316 October 2023
EPID:L-2023-OLL-0042
EPID:L-2024-LLA-0007
TAC:5299530 June 198530 June 1985
TAC:5300930 September 198522 October 1986
TAC:5735915 January 198820 September 1989
TAC:573611 October 19861 April 1987
TAC:5736324 May 198824 May 1988
TAC:5736527 August 198612 November 1987
TAC:5736731 July 198931 July 1989
TAC:5736824 April 19852 December 1986
TAC:5736910 October 198426 April 1985
TAC:57372
TAC:5737330 April 198731 May 1989
TAC:573747 October 19867 October 1986
TAC:5737719 July 198819 July 1988
TAC:5737921 July 198621 July 1986
TAC:573809 May 198521 July 1986
TAC:5738130 September 198530 September 1985
TAC:573827 October 19867 October 1986