Semantic search
Jump to navigation
Jump to search
Name | Start date | End date | |
---|---|---|---|
EPID:L-2018-JLD-0178 | 3 May 2019 | 3 May 2019 | |
EPID:L-2018-LLA-0174 | 5 July 2018 | 1 July 2019 | |
EPID:L-2018-LLA-0200 | 22 August 2018 | 17 June 2019 | |
EPID:L-2018-LLR-0117 | 14 September 2018 | 20 June 2019 | |
EPID:L-2018-LRM-0037 | 16 July 2018 | 16 July 2018 | |
EPID:L-2019-LLA-0141 | NRR E-mail Capture - (External_Sender) Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - State Response | 1 July 2019 | 4 August 2020 |
EPID:L-2019-LLA-0142 | License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | 8 July 2019 | 21 September 2020 |
EPID:L-2019-LLA-0191 | NRR E-mail Capture - (External_Sender) State Notification of Amendments to Catawba Nuclear Station, Units 1 & 2: Revise TS 3.0.5 | 4 September 2019 | 31 January 2020 |
EPID:L-2019-LLR-0046 | 11 June 2019 | 17 September 2019 | |
EPID:L-2019-LRM-0048 | 7 August 2019 | 26 August 2019 | |
EPID:L-2019-LRO-0015 | Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report | 11 March 2019 | 15 July 2019 |
EPID:L-2019-LRO-0064 | 4 September 2019 | 4 September 2019 | |
EPID:L-2019-LRO-0097 | SLC Manual Revision to Loes and 16.8:2 | 19 December 2019 | 22 July 2020 |
EPID:L-2020-LLA-0192 | 29 January 2021 | 23 June 2021 | |
EPID:L-2020-LLA-0198 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 4 February 2021 | 26 August 2021 |
EPID:L-2020-LLE-0003 | Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | 9 January 2020 | 6 April 2021 |
EPID:L-2020-LLE-0158 | Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes | 22 October 2020 | 2 November 2020 |
EPID:L-2020-LLL-0198 | |||
EPID:L-2020-LLQ-0006 | 27 August 2021 | 5 October 2021 | |
EPID:L-2020-LLR-0124 | Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | 16 September 2020 | 6 May 2021 |
EPID:L-2020-LLR-0125 | Duke Energy - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 16 September 2020 | 9 November 2020 |
EPID:L-2020-LLR-0126 | Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI in Accordance with 10 CFR 50.55a(g)(4)(iv) | 21 September 2020 | 16 February 2021 |
EPID:L-2020-LLR-0156 | Duke Energy Carolinas, LLC - Relief Request for Alternative for Reactor Vessel Closure Stud Examinations | 1 December 2020 | 18 November 2022 |
EPID:L-2021-LLA-0111 | TSTF-439 | 9 June 2021 | 14 June 2022 |
EPID:L-2021-LLA-0161 | TSTF-577 | 16 September 2021 | 4 March 2022 |
EPID:L-2021-LLA-0198 | Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Revisions 1, 2, and 3 | 25 October 2021 | 19 July 2022 |
EPID:L-2021-LLA-0230 | SECY-22-0090: Duke Energy Request to Relocate the Emergency Operations Facility | 14 December 2021 | 10 March 2023 |
EPID:L-2021-LLR-0028 | 20 September 2021 | 20 September 2021 | |
EPID:L-2021-LLR-0043 | ASME Code Case N-885 | 8 June 2021 | 11 January 2022 |
EPID:L-2021-LRM-0078 | License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology | 3 August 2021 | 22 September 2021 |
EPID:L-2021-LRM-0110 | December 7, 2021, Pre-submittal Presentation Regarding Embedded Flaw Repair Relief Request | 23 April 2021 | 14 December 2021 |
EPID:L-2021-LRM-0112 | 29 November 2021 | 29 December 2021 | |
EPID:L-2021-LRO-0043 | Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report | 2 August 2021 | 18 January 2022 |
EPID:L-2021-NFO-0004 | 16 March 2021 | 26 May 2021 | |
EPID:L-2022-LLA-0011 | TSTF-541 | 18 January 2022 | 14 November 2022 |
EPID:L-2022-LLA-0036 | TSTF 569 | 24 March 2022 | 12 September 2022 |
EPID:L-2022-LLE-0016 | Magnastor Amendment 12 RAI 1 | 16 May 2022 | |
EPID:L-2022-LLR-0010 | SLC Manual Revision to Loes and 16.11-2 | 24 April 2021 | 31 August 2022 |
EPID:L-2022-LRM-0031 | TSTF-425 TSTF-545 | 20 April 2022 | 10 May 2022 |
EPID:L-2022-LRM-0086 | Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws) | 15 December 2022 | |
EPID:L-2022-LRO-0050 | License Renewal | ||
EPID:L-2023-LLA-0015 | TSTF-493 TSTF-425 TSTF-545 | 1 February 2023 | 20 June 2023 |
EPID:L-2023-LLA-0028 | TSTF-554 | 16 February 2023 | 29 August 2023 |
EPID:L-2023-LLA-0093 | |||
EPID:L-2023-LLE-0050 | |||
EPID:L-2023-LLR-0003 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | 26 July 2023 |
EPID:L-2023-LLR-0018 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | 1 May 2023 |
EPID:L-2023-LLR-0020 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | 30 May 2023 |
EPID:L-2023-LRO-0028 | 24 April 2023 | 24 April 2023 | |
EPID:L-2023-OLL-0021 | 14 April 2023 | 14 April 2023 |