Name | Start date | End date | |
---|---|---|---|
CAC:MF9080 | 19 October 2017 | 19 October 2017 | |
CAC:MF9126 | 6 April 2017 | 12 October 2017 | |
CAC:MF9272 | 12 December 2017 | 12 December 2017 | |
CAC:MF9409 | 27 April 2017 | 26 September 2018 | |
CAC:MF9456 | 7 November 2017 | 26 September 2018 | |
CAC:MF9572 | 10 April 2017 | 9 June 2017 | |
CAC:MF9580 | 1 March 2018 | 1 March 2018 | |
CAC:MF9582 | 1 March 2018 | 1 March 2018 | |
CAC:MF9704 | 12 May 2017 | 8 August 2017 | |
CAC:MF9714 | 18 May 2017 | 16 May 2019 | |
CAC:MF9715 | 18 May 2017 | 12 July 2017 | |
CAC:MF9887 | Clarification of Rod Position Requirements | 30 June 2017 | 16 August 2017 |
CAC:MG0010 | 19 July 2017 | 4 September 2018 | |
CAC:MG0078 | 1 August 2017 | 31 August 2017 | |
CAC:MG0086 | 8 August 2017 | 13 March 2018 | |
CAC:MG0120 | 11 August 2017 | 22 January 2018 | |
CAC:MG0133 | 11 August 2017 | 30 July 2018 | |
CAC:TM3111 | 8 February 2017 | ||
CAC:U01938 | 5 December 2017 | 5 December 2017 | |
EPID:L-2015-LLF-0001 | EA-14-094 | 19 July 2018 | 21 June 2019 |
EPID:L-2016-JLD-0001 | 28 July 2018 | 28 July 2018 | |
EPID:L-2017-FPR-0006 | Package: Environmental Assessment and Finding of No Significant Impact for First Energy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Beaver Valley ISFSI | 7 June 2019 | 8 August 2019 |
EPID:L-2017-LLE-0019 | Exemption Request for Physical Barrier Requirement | 19 July 2017 | 4 September 2018 |
EPID:L-2017-LLL-0024 | 3 November 2017 | 6 April 2018 | |
EPID:L-2017-LLR-0130 | 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) | 25 October 2017 | 27 March 2018 |
EPID:L-2017-LLR-0131 | Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule | 21 April 2017 | 28 March 2018 |
EPID:L-2017-LLR-0137 | Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule | 6 October 2017 | 6 April 2018 |
EPID:L-2017-LLR-0138 | Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-4 Examination Requirements (Request No. 2-TYP-4-RV-02) | 13 November 2017 | 10 August 2018 |
EPID:L-2017-LRM-0061 | 20 December 2017 | 20 December 2017 | |
EPID:L-2017-LRO-0083 | 1 April 2019 | 1 April 2019 | |
EPID:L-2018-JLD-0175 | Request for Completion of Review of Actions Related to Beyond-Design-Basis External Events Flooding Actions | 28 August 2019 | 28 August 2019 |
EPID:L-2018-LLA-0075 | 28 March 2018 | 25 February 2019 | |
EPID:L-2018-LLA-0287 | License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition | 22 October 2018 | 6 August 2019 |
EPID:L-2018-LLE-0016 | 4 June 2019 | 4 June 2019 | |
EPID:L-2018-LLE-0025 | Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H | 18 December 2018 | 5 June 2019 |
EPID:L-2018-LLL-0008 | 1 OF 4, LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions | 13 September 2017 | 12 April 2018 |
EPID:L-2018-LLL-0016 | Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles, LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles | 18 September 2017 | 9 October 2018 |
EPID:L-2018-LLL-0023 | Firstenergy Nuclear Operating Company Request for Approval of Certified Fuel Handler Training Program | 15 August 2018 | 11 April 2019 |
EPID:L-2018-LLR-0026 | 3 April 2018 | 27 August 2018 | |
EPID:L-2018-LRM-0067 | Pre-Application Meeting with Firstenergy Nuclear Operating Company (FENOC) Regarding the Planned Submittal of the Permantly Shutdown Emergency Plan | 14 November 2018 | |
EPID:L-2018-LRO-0034 | 28 November 2018 | 28 November 2018 | |
EPID:L-2018-LRO-0045 | 16 November 2018 | 16 November 2018 | |
EPID:L-2018-LRO-0105 | Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report | 13 November 2018 | 9 April 2019 |
EPID:L-2018-OLL-0023 | |||
EPID:L-2019-JLD-0007 | SRM-M190124A: Affirmation Session-SECY-16-0142: Final Rule: Mitigation of Beyond-Design-Basis Events (Rin 3150-AJ49) | 24 January 2019 | 10 October 2019 |
EPID:L-2019-LLA-0155 | November 2019 NPDES Discharge Monitoring Report (DMR) | 18 December 2019 | 5 February 2021 |
EPID:L-2019-LLA-0223 | License Amendment Request to Modify Technical Specifications 3.4.16, RCS Specific Activity, 3.7.13 Secondary Specific Activity, 5.5.7, Ventilation Filter Testing Program (Vftp), and 5.5.14, Control Room Envelope. | 20 October 2019 | 30 November 2020 |
EPID:L-2019-LLA-0252 | TSTF-425 | 14 November 2019 | 3 November 2020 |
EPID:L-2019-LLL-0028 | Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for the Davis-Besse Nuclear Power Station | 30 April 2019 | 18 December 2019 |
EPID:L-2019-LLM-0000 | Stations - Irradiated Fuel Management Plans | 15 March 2019 | 9 December 2019 |