Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-089Change to Frequency of SR 3.1.8.1000
TSTF-090Add a Note to LCO 3.5.3 That Allows RHR to Be Operable as ECCS When Aligned for Decay Heat Removal000
TSTF-091Relocate the Trip Setpoints and Allowable Values for Loss of Voltage and Undervoltage to the Bases000
TSTF-092Revise the Containment Purge and Exhaust SR to Exempt Valves That Are Locked, Sealed or Secured000
TSTF-093Change the Frequency of Pressurizer Heater Testing from 92 Days to 18 Months000
TSTF-094Remove Number of Required Pressurizer Heater Groups from Pressurizer LCO000
TSTF-095Revise Completion Time for Reducing Power Range High Trip Setpoint from 8 to 72 Hours100
TSTF-096Delete the Initial Performance of the Boron Concentration Measurement with No Source Range Detectors000
TSTF-097Revise Note to SR 3.2.1.2, Fq Measurement000
TSTF-098Relocate the Fqz Penalty Factor to the Colr000
TSTF-099Extend the Completion Time for Fq(W) Not within Limits from 2 Hours to 4 Hours000
TSTF-100Revise Adv Action B to State Restore All But One Adv to Operable Status000
TSTF-101Change AFW Pump Testing Frequency to Be in Accordance with the Inservice Testing Program000
TSTF-102Extend the Periodic Verification of Inoperable MSIV and Mfiv Closure to 31 Days000
TSTF-103Add Bracketed Information to LCO 3.0.4 Inappropriately Deleted by Rev. 0 Change BWR-26000
TSTF-104Relocates Discussion of Exceptions from LCO 3.0.4 to the Bases000
TSTF-105Remove the Details of Performing an RCS Flow Measurement000
TSTF-106Change to Diesel Fuel Oil Testing Program000
TSTF-107Separate Control Rods That Are Untrippable Versus Inoperable010
TSTF-108Eliminate the 12 Hour Cot on Power Range and Intermediate Range Channels for Physics Test Exceptions300
TSTF-109Clarify the Qptr Surveillances000
TSTF-110Delete SR Frequencies Based on Inoperable Alarms210
TSTF-111Revise Bases for SRS 3.3.1.16 and 3.3.2.10 to Eliminate Pressure Sensor Response Time Testing100
TSTF-112Revise Condition D in Tech Spec 3.2.3.A000
TSTF-113Eliminate Shutdown to Mode 4 for Inoperable Porvs000
TSTF-114Revise Bases for 3.4.7 to Address DHR Via Natural Circulation000
TSTF-115Battery Float Current and Battery Inspection Program020
TSTF-116RCS Inventory Balance SR Regarding Steady State Clarification000
TSTF-117Revise Accumulator Pressure Reference from Pressurizer to RCS000
TSTF-118Administrative Controls Program Exceptions000
TSTF-119Delete Fire Protection Program Implementation from Administrative Controls200
TSTF-120Simplify Fuel Oil Sampling000
TSTF-121Remove Regulatory Duplication from Shift Manning Requirements000
TSTF-122Revise LCO 3.0.2 Bases to Remove Possible Confusion000
TSTF-1353.3 - RPS and ESFAS Instrumentation000
TSTF-136Combine LCO 3.1.1 and 3.1.2000
TSTF-137Relocation of the 3.4.16 Action Note a Bases000
TSTF-138Addition of Action for Inoperable Steam Generator000
TSTF-139Incorrect Criteria Defined in B 3.7.16000
TSTF-140Correct Condensate Storage Tank LCO and Criteria000
TSTF-142Increase the Completion Time When the Core Reactivity Balance is Not within Limit320
TSTF-145Add Action to Verify Flow Path is Isolated When 2 Civs Inoperable000
TSTF-151PORV Operability Clarification000
TSTF-152Revise Reporting Requirements to Be Consistent with 10 CFR 20010
TSTF-153Clarify Exception Notes to Be Consistent with the Requirement Being Excepted010
TSTF-154Revise Criteria Discussions of Special Test Exceptions000
TSTF-1553.5.1 Core Flood TANKS- Deletion of Condition D and Modification of Condition C000
TSTF-161SI Reference Applicability000
TSTF-162Maximum Pressurizer Water Level Limit Bases000
TSTF-163Minimum Vs. Steady State Voltage and Frequency710