Semantic search
Jump to navigation
Jump to search
Title | I | O | W | |
---|---|---|---|---|
TSTF-196 | Revise Isolation Devices to Include Asme/Ansi Equivalent Methods | 0 | 0 | 0 |
TSTF-198 | Specification 3.8.6 - Unlimited Use of Battery Charging Current in Lieu of Specific Gravity | 0 | 0 | 0 |
TSTF-199 | 3.8.4 - Delete Maintenance Surveillances | 0 | 0 | 0 |
TSTF-200 | Unlimited Use of Battery Modified Performance Discharge Test | 0 | 0 | 0 |
TSTF-201 | Omit Battery Conditional Evalutations from SR 3.8.6.2 | 0 | 0 | 0 |
TSTF-202 | Revise Battery Surveillance Weekly Frequencies | 0 | 1 | 0 |
TSTF-203 | Add Bases for 3.8.6 Actions Note | 0 | 1 | 0 |
TSTF-204 | Revise DC Sources - Shutdown and Inverters - Shutdown to Address Specific Subsystem Requirements | 2 | 1 | 0 |
TSTF-205 | Revision of Channel Calibration, Channel Functional Test, and Related Definitions | 2 | 1 | 0 |
TSTF-206 | Applicabilities of Suppression Pool Average Temperature Limits | 0 | 0 | 0 |
TSTF-207 | Completion Time for Restoration of Various Excessive Leakage Rates | 1 | 1 | 0 |
TSTF-222 | Control Rod SCRAM Time Testing | 7 | 0 | 0 |
TSTF-223 | Increase Completion Time for HPCI and One ADS Valve Inoperable | 0 | 0 | 0 |
TSTF-224 | Increase Completion Time for One ADS and One LOW Pressure ECCS Inoperable | 0 | 0 | 0 |
TSTF-225 | Fuel Movement with Inoperable Refueling Equipment Interlocks | 2 | 0 | 1 |
TSTF-226 | Fuel Loading with Control Rods Withdrawn or Removed from Defueled Core Cells | 0 | 0 | 0 |
TSTF-227 | Revision to EOC-RPT Pump Actions | 0 | 0 | 0 |
TSTF-228 | Revise RHR Applicability | 0 | 0 | 0 |
TSTF-229 | Revise SR 3.2.2.2 for Consistency with SR 3.1.4.4 | 0 | 0 | 0 |
TSTF-230 | Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling | 6 | 0 | 0 |
TSTF-231 | Reword Bases for Turbine Stop Valve (TSV) Closure Function Ofrps Instrumentation LCO | 0 | 0 | 0 |
TSTF-232 | Refuel Equipment Interlocks Applicability Change | 0 | 0 | 0 |
TSTF-250 | Delete Specific FSAR Section References | 0 | 0 | 0 |
TSTF-251 | Eliminate TS 5.5.6, PRE-STRESSED Concrete Containment Tendon Surveillance Program | 0 | 0 | 0 |
TSTF-253 | Omit Note Which Indicates That Performance of One SR Satisfies Another | 0 | 0 | 0 |
TSTF-254 | Extend Frequency of Accumulated Water Checks for DG Fuel Oil | 0 | 0 | 0 |
TSTF-257 | Revise Leakage Detection Instrument Conditions to Eliminate Requirement to Enter LCO 3.0.3 | 0 | 0 | 0 |
TSTF-258 | Changes to Section 5.0, Administrative Controls | 10 | 14 | 0 |
TSTF-264 | 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS | 3 | 1 | 0 |
TSTF-266 | Eliminate the Remote Shutdown System Table of Instrumentation and Controls | 5 | 1 | 0 |
TSTF-267 | Add a Section 1.4 Example of Frequency Based on Plant Conditions | 0 | 0 | 0 |
TSTF-269 | Allow Administrative Means of Position Verification for Locked or Sealed Valves | 6 | 1 | 0 |
TSTF-270 | Add Only Required to Be Performed Example to 1.4 | 0 | 0 | 0 |
TSTF-273 | SFDP Clarifications | 4 | 1 | 0 |
TSTF-274 | Move the Acceptance Criteria for the Battery Charger Performance Test to the Bases | 0 | 0 | 0 |
TSTF-275 | Clarify Requirement for EDG Start Signal on RPV Level - LOW, LOW, LOW During RPV Cavity FLOOD-UP | 2 | 0 | 0 |
TSTF-276 | Revise DG Full Load Rejection Test | 3 | 1 | 0 |
TSTF-278 | Battery Cell Parameters (LCO 3.8.6) Includes More than Table 3.8.6-1 Limits | 0 | 0 | 0 |
TSTF-279 | Remove Applicable Supports from Inservice Testing Program | 2 | 0 | 0 |
TSTF-283 | Modify Section 3.8 Mode Restriction Notes | 10 | 4 | 1 |
TSTF-287 | Ventilation System Envelope Allowed Outage Time | 9 | 3 | 1 |
TSTF-295 | Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration | 1 | 0 | 0 |
TSTF-296 | Revise LCO 3.10.5, Single CRD Removal - Refueling, to Require a Withdrawal Block for All Other Rods | 0 | 0 | 0 |
TSTF-297 | Addition of Required Action C.1 to 3.3.2.2, Feedwater - Main Turbine High Water Level Trip Inst. | 0 | 1 | 0 |
TSTF-298 | Allowance for S/Rvs to Be Replaced with Spare Operable S/Rvs Having Lower Setpoints | 0 | 0 | 0 |
TSTF-299 | Administrative Controls Program 5.5.2.B Test Interval and Exception | 2 | 1 | 0 |
TSTF-300 | Eliminate DG LOCA-START SRS While in S/D When No ECCS is Required | 2 | 0 | 0 |
TSTF-301 | Revise the 1 Hour Completion Time for Administrative Check of RCIC Operability | 0 | 0 | 0 |
TSTF-302 | Delete Specifics of Zirconium Alloys from Design Features | 0 | 0 | 0 |
TSTF-306 | Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 10 | 0 | 0 |