 TitleIOW
TSTF-196Revise Isolation Devices to Include Asme/Ansi Equivalent Methods000
TSTF-198Specification 3.8.6 - Unlimited Use of Battery Charging Current in Lieu of Specific Gravity000
TSTF-1993.8.4 - Delete Maintenance Surveillances000
TSTF-200Unlimited Use of Battery Modified Performance Discharge Test000
TSTF-201Omit Battery Conditional Evalutations from SR 3.8.6.2000
TSTF-202Revise Battery Surveillance Weekly Frequencies010
TSTF-203Add Bases for 3.8.6 Actions Note010
TSTF-204Revise DC Sources - Shutdown and Inverters - Shutdown to Address Specific Subsystem Requirements210
TSTF-205Revision of Channel Calibration, Channel Functional Test, and Related Definitions210
TSTF-206Applicabilities of Suppression Pool Average Temperature Limits000
TSTF-207Completion Time for Restoration of Various Excessive Leakage Rates110
TSTF-222Control Rod SCRAM Time Testing700
TSTF-223Increase Completion Time for HPCI and One ADS Valve Inoperable000
TSTF-224Increase Completion Time for One ADS and One LOW Pressure ECCS Inoperable000
TSTF-225Fuel Movement with Inoperable Refueling Equipment Interlocks201
TSTF-226Fuel Loading with Control Rods Withdrawn or Removed from Defueled Core Cells000
TSTF-227Revision to EOC-RPT Pump Actions000
TSTF-228Revise RHR Applicability000
TSTF-229Revise SR 3.2.2.2 for Consistency with SR 3.1.4.4000
TSTF-230Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling600
TSTF-231Reword Bases for Turbine Stop Valve (TSV) Closure Function Ofrps Instrumentation LCO000
TSTF-232Refuel Equipment Interlocks Applicability Change000
TSTF-250Delete Specific FSAR Section References000
TSTF-251Eliminate TS 5.5.6, PRE-STRESSED Concrete Containment Tendon Surveillance Program000
TSTF-253Omit Note Which Indicates That Performance of One SR Satisfies Another000
TSTF-254Extend Frequency of Accumulated Water Checks for DG Fuel Oil000
TSTF-257Revise Leakage Detection Instrument Conditions to Eliminate Requirement to Enter LCO 3.0.3000
TSTF-258Changes to Section 5.0, Administrative Controls10140
TSTF-2643.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS310
TSTF-266Eliminate the Remote Shutdown System Table of Instrumentation and Controls510
TSTF-267Add a Section 1.4 Example of Frequency Based on Plant Conditions000
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves610
TSTF-270Add Only Required to Be Performed Example to 1.4000
TSTF-273SFDP Clarifications410
TSTF-274Move the Acceptance Criteria for the Battery Charger Performance Test to the Bases000
TSTF-275Clarify Requirement for EDG Start Signal on RPV Level - LOW, LOW, LOW During RPV Cavity FLOOD-UP200
TSTF-276Revise DG Full Load Rejection Test310
TSTF-278Battery Cell Parameters (LCO 3.8.6) Includes More than Table 3.8.6-1 Limits000
TSTF-279Remove Applicable Supports from Inservice Testing Program200
TSTF-283Modify Section 3.8 Mode Restriction Notes1041
TSTF-287Ventilation System Envelope Allowed Outage Time931
TSTF-295Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration100
TSTF-296Revise LCO 3.10.5, Single CRD Removal - Refueling, to Require a Withdrawal Block for All Other Rods000
TSTF-297Addition of Required Action C.1 to 3.3.2.2, Feedwater - Main Turbine High Water Level Trip Inst.010
TSTF-298Allowance for S/Rvs to Be Replaced with Spare Operable S/Rvs Having Lower Setpoints000
TSTF-299Administrative Controls Program 5.5.2.B Test Interval and Exception210
TSTF-300Eliminate DG LOCA-START SRS While in S/D When No ECCS is Required200
TSTF-301Revise the 1 Hour Completion Time for Administrative Check of RCIC Operability000
TSTF-302Delete Specifics of Zirconium Alloys from Design Features000
TSTF-306Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration1000