 Start dateSiteTitle
AEP-NRC-2014-16, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2014CookSix Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
AEP-NRC-2014-26, Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation31 March 2014CookResponse to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation
AEP-NRC-2014-67, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 August 2014CookThird Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
AEP-NRC-2014-89, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events16 December 2014CookCompliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events
AEP-NRC-2014-90, Compliance with March 12, 2012, Us Nuclear Regulatory Commission (NRC) Order Regarding Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)16 December 2014CookCompliance with March 12, 2012, Us Nuclear Regulatory Commission (NRC) Order Regarding Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
AEP-NRC-2015-22, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)16 June 2015CookCompliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
AEP-NRC-2015-23, Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)16 June 2015CookFinal Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)1 October 2015CookRevision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
AEP-NRC-2017-55, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment15 November 2017CookRequest for Extension of Due Date for Seismic Probabilistic Risk Assessment
AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency1 February 2022CookQuality Assurance Program Change Request for Internal Audit Frequency
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 February 2013BrunswickOverall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
BSEP 13-0073, Response to Request for Additional Information Regarding Overall Integrated Plan Submitted in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-22 July 2013BrunswickResponse to Request for Additional Information Regarding Overall Integrated Plan Submitted in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-0
BSEP 13-0088, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)20 August 2013BrunswickFirst Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
BSEP 14-0005, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2014BrunswickSecond Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
BSEP 14-0006, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2014BrunswickSecond Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BSEP 14-0085, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2014BrunswickThird Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
BSEP 14-0086, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2014BrunswickThird Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BSEP 15-0009, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2015BrunswickFourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BSEP 15-0033, Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Order EA-12-051, Order to Modify Licenses..3 June 2015BrunswickNotification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Order EA-12-051, Order to Modify Licenses..
BSEP 15-0063, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 August 2015BrunswickFifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
BSEP 15-0064, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 August 2015BrunswickFifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BSEP 16-0006, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)24 February 2016BrunswickSixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
BSEP 16-0007, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)24 February 2016BrunswickSixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BSEP 16-0024, Notification of Full Compliance with Order EA-12-049, and Order EA-12-05119 May 2016BrunswickNotification of Full Compliance with Order EA-12-049, and Order EA-12-051
BSEP 16-0042, Fourth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)28 June 2016BrunswickFourth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)
BSEP 16-0111, (Bsep), Unit Nos. 1 & 2, Fifth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ...15 December 2016Brunswick(Bsep), Unit Nos. 1 & 2, Fifth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ...
BVY 12-022, Entergy'S Answer to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)30 March 2012Vermont YankeeEntergy'S Answer to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BVY 12-073, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 October 2012Vermont YankeeInitial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BVY 13-015, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2013Vermont YankeeOverall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BVY 13-065, Response to Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)19 July 2013Vermont YankeeResponse to Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
BVY 14-015, Vermont Yankee'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 February 2014Vermont YankeeVermont Yankee'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
BVY 14-023, Request for Exemption from 10 CFR 50.54(w)(1), Vermont Yankee Nuclear Power Station17 April 2014Vermont YankeeRequest for Exemption from 10 CFR 50.54(w)(1), Vermont Yankee Nuclear Power Station
BVY 14-027, Request for Exemption from 10 CFR 140.11(a)(4), Vermont Yankee Nuclear Power Station17 April 2014Vermont YankeeRequest for Exemption from 10 CFR 140.11(a)(4), Vermont Yankee Nuclear Power Station
BVY 14-066, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Request to Rescind Order28 August 2014Vermont YankeeThird Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Request to Rescind Order
BVY 15-016, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Orders Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-51) and Mitigation Strategies for Beyond-Design-Basis..27 February 2015Vermont YankeeFourth Six-Month Status Report in Response to March 12, 2012 Commission Orders Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-51) and Mitigation Strategies for Beyond-Design-Basis..
CNL-13-115, Change to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-05129 October 2013Watts BarChange to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051
CNL-13-125, Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)22 November 2013Watts BarResponse to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (
CNL-14-007, Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number10 January 2014Watts BarFollow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA
CNL-14-028, Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation28 February 2014Browns FerrySecond Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation
CNL-14-029, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant28 February 2014SequoyahSecond Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant
CNL-14-030, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2014Watts BarSecond Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
CNL-14-072, Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-025 June 2014Watts BarFollow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051
CNL-14-129, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant28 August 2014Browns FerryThird Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant
CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant28 August 2014SequoyahThird Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant
CNL-14-131, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant28 August 2014Watts BarThird Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant
CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro28 August 2014Browns FerryThird Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Brown
CNL-14-145, Bellefonte Nuclear Plant Units 1 and 2, Tennessee Valley Authority - Proposed Alternative Submittal Schedule as Described in the Attached Enclosures Due to the Deferred Construction Status21 October 2014BellefonteBellefonte Nuclear Plant Units 1 and 2, Tennessee Valley Authority - Proposed Alternative Submittal Schedule as Described in the Attached Enclosures Due to the Deferred Construction Status
CNL-14-191, Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-04930 October 2014Watts BarCompliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049).
CNL-14-192, Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant29 October 2014Watts BarCompliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant
CNL-14-232, Closure of Open Item Discussed in Tennessee Valley Authority'S Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)19 December 2014Watts BarClosure of Open Item Discussed in Tennessee Valley Authority'S Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)