Semantic search

Jump to navigation Jump to search
 NameStart dateEnd date
EPID:L-2019-LLR-0013Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0)20 February 201916 October 2019
EPID:L-2019-LLR-0082Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements27 August 201928 April 2020
EPID:L-2019-LLR-0083Unit 1, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements23 August 201926 March 2020
EPID:L-2019-LRA-014022 October 202022 October 2020
EPID:L-2019-LRO-0000Day Steam Generator Tube Inspection Report28 March 201911 July 2019
EPID:L-2019-LRO-001620 September 201920 September 2019
EPID:L-2019-LRO-004226 June 201926 January 2021
EPID:L-2020-CRS-00058 November 202017 November 2020
EPID:L-2020-LLA-0025License Amendment Request - Proposed Change to Technical Specifications Sections 1.1. Definitions, and 5.0 Administrative Controls. for Permanently Defueled Condition11 February 202018 February 2021
EPID:L-2020-LLA-007116 April 202022 May 2023
EPID:L-2020-LLA-0127TSTF-56329 June 20201 September 2022
EPID:L-2020-LLA-0138License Amendment Request to Correct Non-conservative Technical Specifications 3.2 .1, Heat Flux Hot Channel Factor Fa(Z) and 5.6.3, Core Operating Limits Report (COLR)23 June 202010 March 2021
EPID:L-2020-LLA-0140License Amendment Request to Revise Technical Specification Requirements Related to Inspection Method and Service Life for Alloy 800 Steam Generator Tubesheet Sleeves22 May 202030 June 2021
EPID:L-2020-LLA-0154TSTF-56710 July 202018 February 2021
EPID:L-2020-LLA-015529 July 202029 July 2020
EPID:L-2020-LLA-022915 October 202115 October 2021
EPID:L-2020-LLE-0011Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50. 75(h)(1 )(Iv)25 February 202020 February 2021
EPID:L-2020-LLE-002518 April 202020 April 2020
EPID:L-2020-LLE-0026Federal Register Notice6 May 20208 May 2020
EPID:L-2020-LLE-0027Federal Register Notice8 May 20208 May 2020
EPID:L-2020-LLE-0033Withdrawal of Certification of Permanent Cessation of Power Operations for Davis-Besse Nuclear Station. Unit No. 1. and Perry Nuclear Power Plant, Unit No. 126 July 201919 May 2020
EPID:L-2020-LLE-0149Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic22 September 20206 November 2020
EPID:L-2020-LLE-0171Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic28 October 202015 December 2020
EPID:L-2020-LLE-0175Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic23 April 202015 December 2020
EPID:L-2020-LLE-0208Incoming Request-Davis-Besse-Energy Harbor Nuclear Corp18 November 202019 November 2020
EPID:L-2020-LLE-0211Incoming Request-Beaver Valley-Energy Harbor Nuclear Corp20 November 202023 November 2020
EPID:L-2020-LLL-00021 February 20211 February 2021
EPID:L-2020-LLL-0023WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 4 of 428 October 20203 June 2021
EPID:L-2020-LLR-0049CFR 50.55a Request Number: VRR5, Revision 0, Relief Valve Test Frequency1 April 20203 June 2020
EPID:L-2020-LLR-005010 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections2 April 202020 August 2020
EPID:L-2020-LLR-0052CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency2 April 202015 April 2022
EPID:L-2020-LLR-0053CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations2 April 20207 August 2020
EPID:L-2020-LRM-0048Presentation Slides - Technical Justification for the Ghent Version 2 Probe Qualification and Probability of Detection - May 26, 2020 (Non-Proprietary Version)22 May 20201 June 2020
EPID:L-2020-LRO-000622 April 202019 May 2020
EPID:L-2020-LRO-0024Request for Threshold Determination - Corporate Organization and Ownership4 May 20201 July 2020
EPID:L-2020-LRO-0042Steam Generator Inspection Reports - Spring 2020 Refueling Outage28 July 202010 March 2021
EPID:L-2020-LRO-0055Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report15 September 20208 June 2021
EPID:L-2020-LRO-0063License Amendment Request to Correct Non-conservative Technical Specification 3.7.4, Atmospheric Dump Valves (Advs)13 October 202019 April 2021
EPID:L-2020-OLL-0032
EPID:L-2020-PPM-00057 September 202115 July 2022
EPID:L-2021-LLA-0019TSTF 55417 February 202116 September 2022
EPID:L-2021-LLA-0075Request for an Amendment to Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR)26 April 202110 May 2022
EPID:L-2021-LLA-0127Emergency Plan Safety Evaluation14 June 20217 October 2022
EPID:L-2021-LLA-0156License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation29 August 20211 September 2022
EPID:L-2021-LLA-0160TSTF-54715 September 202128 June 2022
EPID:L-2021-LLA-0193TSTF-55420 September 202116 November 2021
EPID:L-2021-LLA-0220TSTF-57715 September 20212 May 2022
EPID:L-2021-LLE-0018Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic15 March 202119 April 2021
EPID:L-2021-LLL-0002TSTF-57727 January 202122 March 2021
EPID:L-2021-LLR-0026ASME Code Case OMN-271 April 202129 March 2022