DCL-85-381, Discusses Possible Items of Noncompliance Identified in 851118-22 Fire Protection Audit,Including Unprotected Structural Steel,Unsealed Bus Duct Penetrations,Inadequate Detector Spacing & Obstructed Sprinkler Coverage31 December 1985Discusses Possible Items of Noncompliance Identified in 851118-22 Fire Protection Audit,Including Unprotected Structural Steel,Unsealed Bus Duct Penetrations,Inadequate Detector Spacing & Obstructed Sprinkler CoverageFire Protection Program
DCL-86-004, Forwards Jan 1986 Diablo Canyon Newsletter, Published to Inform San Luis Obispo County Residents About Facility & Emergency Response Plan.Newsletter Will Be Provided to NRC to Facilitate Awareness of Util Public Educ Program16 January 1986Forwards Jan 1986 Diablo Canyon Newsletter, Published to Inform San Luis Obispo County Residents About Facility & Emergency Response Plan.Newsletter Will Be Provided to NRC to Facilitate Awareness of Util Public Educ Program
DCL-86-010, Confirms Request to Delay Annual Audit of Contingency Plan Until First Quarter 1986 Per 851018 Telcon.Resources Currently Committed to Ongoing Drug Investigation23 December 1985Confirms Request to Delay Annual Audit of Contingency Plan Until First Quarter 1986 Per 851018 Telcon.Resources Currently Committed to Ongoing Drug Investigation
DCL-86-013, Requests Confirmation That 860610 Is Acceptable Date for 1986 Emergency Preparedness Exercise23 January 1986Requests Confirmation That 860610 Is Acceptable Date for 1986 Emergency Preparedness Exercise
DCL-86-016, Informs That No Formal Agreement Required to Install Contingency Telecommunications Equipment,Per NRC 850620 Request,Since field-ready Units Will Not Be Placed in Util Radio Vaults24 January 1986Informs That No Formal Agreement Required to Install Contingency Telecommunications Equipment,Per NRC 850620 Request,Since field-ready Units Will Not Be Placed in Util Radio Vaults
DCL-86-017, Forwards Rev 14 to Security Plan,Including Responses to 851112 Comments Re Rev 13.Rev Withheld (Ref 10CFR73.21)27 January 1986Forwards Rev 14 to Security Plan,Including Responses to 851112 Comments Re Rev 13.Rev Withheld (Ref 10CFR73.21)
DCL-86-027, Forwards Rept on Anchor Darling A/D 5500 Snubbers Installed on Piping Sys,Per 860109 Request Re Part 21 Reportability. Facility Operability Unaffected by Excessive Drag Characteristic Exhibited by Snubbers4 February 1986Forwards Rept on Anchor Darling A/D 5500 Snubbers Installed on Piping Sys,Per 860109 Request Re Part 21 Reportability. Facility Operability Unaffected by Excessive Drag Characteristic Exhibited by SnubbersAnchor Darling
Power change
DCL-86-032, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or Overexposure13 February 1986Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or Overexposure
DCL-86-038, Responds to NRC Re Violations Noted in Insp Rept 50-275/85-44.Corrective Actions:Snm Physical Inventory Performed & Administrative Procedure APD-751, Control & Accountability of SNM, Revised18 February 1986Responds to NRC Re Violations Noted in Insp Rept 50-275/85-44.Corrective Actions:Snm Physical Inventory Performed & Administrative Procedure APD-751, Control & Accountability of SNM, Revised
DCL-86-046, Responds to NRC Re Violations Noted in Insp Repts 50-275/85-41 & 50-323/85-39.Corrective Actions:Chemical Analysis Procedure A-6 Revised & Procedure AP C-152 Will Be Revised to Require Daily Time Strike of Recorders24 February 1986Responds to NRC Re Violations Noted in Insp Repts 50-275/85-41 & 50-323/85-39.Corrective Actions:Chemical Analysis Procedure A-6 Revised & Procedure AP C-152 Will Be Revised to Require Daily Time Strike of Recorders
DCL-86-047, Forwards Response to IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps. Program Implemented to Monitor Auxiliary Feedwater Piping by Hand to Identify Excessive Heat25 February 1986Forwards Response to IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps. Program Implemented to Monitor Auxiliary Feedwater Piping by Hand to Identify Excessive Heat
DCL-86-058, Forwards Public Version of Revised Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan SOP III.08.W/860314 Release Memo7 March 1986Forwards Public Version of Revised Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan SOP III.08.W/860314 Release Memo
DCL-86-062, Updates 850222 Response to Allegation 1544 Re silver-brazed Fittings on Capillary Sys.Unit 1 Vol Control Tank Level Instrument (LT-112) Upgraded to Design Class 1B.Conclusions from Destructive Exam Apply10 March 1986Updates 850222 Response to Allegation 1544 Re silver-brazed Fittings on Capillary Sys.Unit 1 Vol Control Tank Level Instrument (LT-112) Upgraded to Design Class 1B.Conclusions from Destructive Exam ApplyBoric Acid
DCL-86-071, Forwards Response to 860212 Notice of Violation & Proposed Imposition of Civil Penalty & $50,000 Payment of Civil Penalty Re Inoperability of One Channel of Actuation Logic of One MSIV14 March 1986Forwards Response to 860212 Notice of Violation & Proposed Imposition of Civil Penalty & $50,000 Payment of Civil Penalty Re Inoperability of One Channel of Actuation Logic of One MSIV
DCL-86-082, Revises 860224 Response to Violations Noted in Insp Repts 50-275/85-41 & 50-323/85-39.Dose Rates Due to Iodines & Particulates Will Be Included in Prerelease Analysis of Containment Purges25 March 1986Revises 860224 Response to Violations Noted in Insp Repts 50-275/85-41 & 50-323/85-39.Dose Rates Due to Iodines & Particulates Will Be Included in Prerelease Analysis of Containment Purges
DCL-86-097, Forwards Response to NRC Re Violations Noted in Insp Rept 50-323/86-05.Corrective actions:on-the-spot Changes Issued for Procedures STPs I-1D & V6 to Include Spare Instrument Test Line10 April 1986Forwards Response to NRC Re Violations Noted in Insp Rept 50-323/86-05.Corrective actions:on-the-spot Changes Issued for Procedures STPs I-1D & V6 to Include Spare Instrument Test Line
DCL-86-123, Presents Progress Toward Full Implementation of Revised Fsar,Chapter 17 Re QA Program.Updated Schedule for FSAR Topics encl.Quality-related QA Procedures in Final Comment Stage & Expected to Be Issued by 8609015 May 1986Presents Progress Toward Full Implementation of Revised Fsar,Chapter 17 Re QA Program.Updated Schedule for FSAR Topics encl.Quality-related QA Procedures in Final Comment Stage & Expected to Be Issued by 860901Fire Protection Program
DCL-86-127, Forwards LERs 84-038-00,85-040-00 & 86-002-01 Re Incomplete Performance of Surveillance Tests.Surveillance Program Improvement Action Plan & Status Discussed W/Region V Mgt on 8604259 May 1986Forwards LERs 84-038-00,85-040-00 & 86-002-01 Re Incomplete Performance of Surveillance Tests.Surveillance Program Improvement Action Plan & Status Discussed W/Region V Mgt on 860425
DCL-86-132, Informs That Addl Time Needed to Respond to IE Bulletin 85-003 Re motor-operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings.Response to Be Submitted in Aug 198613 May 1986Informs That Addl Time Needed to Respond to IE Bulletin 85-003 Re motor-operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings.Response to Be Submitted in Aug 1986
DCL-86-148, Responds to NRC Re Violations Noted in Insp Repts 50-275/86-02 & 50-323/86-02.Corrective Actions:Procedures M-54.4 & E-53.4 Re Spiral Gasket Replacement & Rotork Valve Adjustment Revised28 May 1986Responds to NRC Re Violations Noted in Insp Repts 50-275/86-02 & 50-323/86-02.Corrective Actions:Procedures M-54.4 & E-53.4 Re Spiral Gasket Replacement & Rotork Valve Adjustment Revised
DCL-86-150, Suppls Response to Violations Noted in Insp Rept 50-275/83-17.Corrective Actions:Nuclear Plant Operator Will Chair Technical Review Group Meeting Involving Nonconformances Initiated by Personnel30 May 1986Suppls Response to Violations Noted in Insp Rept 50-275/83-17.Corrective Actions:Nuclear Plant Operator Will Chair Technical Review Group Meeting Involving Nonconformances Initiated by Personnel
DCL-86-151, Responds to NRC Re Violations Noted in Insp Rept 50-275/86-09.Corrective Actions:Radiation Worker & Operator Training & Requalification Programs Will Provide Emphasis on Proper Conduct in Radiologically Controlled Area30 May 1986Responds to NRC Re Violations Noted in Insp Rept 50-275/86-09.Corrective Actions:Radiation Worker & Operator Training & Requalification Programs Will Provide Emphasis on Proper Conduct in Radiologically Controlled Area
DCL-86-162, Responds to NRC Re Violations Noted in Insp Repts 50-275/86-11 & 50-323/86-12.Corrective Actions:Program for Calibr Methodology Re Use of Flow Rate Measuring Device as Monitor Will Be Completed by 8607319 June 1986Responds to NRC Re Violations Noted in Insp Repts 50-275/86-11 & 50-323/86-12.Corrective Actions:Program for Calibr Methodology Re Use of Flow Rate Measuring Device as Monitor Will Be Completed by 860731Grab sample
DCL-86-181, Forwards Changes to Rev 14 to Physical Security Plan in Response to Comments in NRC .Changes Withheld (Ref 10CFR73.21)24 June 1986Forwards Changes to Rev 14 to Physical Security Plan in Response to Comments in NRC .Changes Withheld (Ref 10CFR73.21)
DCL-86-186, Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed30 June 1986Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed
DCL-86-194, Forwards Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. W/Dh Grimsley 860723 Release Memo11 July 1986Forwards Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. W/Dh Grimsley 860723 Release MemoSafe Shutdown
Earthquake
DCL-86-221, Forwards Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire. Encl 2 Identifies Privacy/Proprietary info.W/860807 Release Memo29 July 1986Forwards Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire. Encl 2 Identifies Privacy/Proprietary info.W/860807 Release MemoSafe Shutdown
Earthquake
DCL-86-222, Confirms That Static O-Ring Series 102-103 Differential Pressure Switches Not Used in safety-related Equipment,In Response to IE Bulletin 86-002, (Action Statement 1),per 10CFR50.49(b).Action Statements 2-6 Inapplicable29 July 1986Confirms That Static O-Ring Series 102-103 Differential Pressure Switches Not Used in safety-related Equipment,In Response to IE Bulletin 86-002, (Action Statement 1),per 10CFR50.49(b).Action Statements 2-6 Inapplicable
DCL-86-235, Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 87013112 August 1986Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 870131
DCL-86-241, Responds to NRC Re Violations Noted in Insp Rept 50-275/86-18.Corrective Actions:Comprehensive Program for Identifying Other Potential Penetration Lines Implemented14 August 1986Responds to NRC Re Violations Noted in Insp Rept 50-275/86-18.Corrective Actions:Comprehensive Program for Identifying Other Potential Penetration Lines ImplementedCondition Adverse to Quality
DCL-86-248, Forwards Changes to Rev 14 to Physical Security Plan Re Reconfiguration of Vital Area Boundary,Addition of Exterior Plant Personnel Door & Updated Drawings.Changes Withheld (Ref 10CFR73.21)21 August 1986Forwards Changes to Rev 14 to Physical Security Plan Re Reconfiguration of Vital Area Boundary,Addition of Exterior Plant Personnel Door & Updated Drawings.Changes Withheld (Ref 10CFR73.21)
DCL-86-261, Forwards Radial Peaking Factor Limit Rept for Unit 1 Cycle 2 Core Reload4 September 1986Forwards Radial Peaking Factor Limit Rept for Unit 1 Cycle 2 Core Reload
DCL-86-262, Responds to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Motor-operated Valve Data Encl2 September 1986Responds to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Motor-operated Valve Data Encl
DCL-86-294, Responds to Request for Comments Re NRC Rept, Trends & Patterns Rept of Unplanned Reactor Trips at Us LWRs in 1985. Comparison of 1985 Unit 2 Trip Record W/Record of Plants in Commercial Operation Inappropriate9 October 1986Responds to Request for Comments Re NRC Rept, Trends & Patterns Rept of Unplanned Reactor Trips at Us LWRs in 1985. Comparison of 1985 Unit 2 Trip Record W/Record of Plants in Commercial Operation Inappropriate
DCL-86-300, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 841001-860322. Rept Consistent W/Reporting Interval of Annual FSAR Update Rev17 October 1986Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 841001-860322. Rept Consistent W/Reporting Interval of Annual FSAR Update Rev
DCL-86-310, Ack Receipt of 861016 SALP Rept.Meeting Unnecessary to Discuss Results of Rept.Salp Board Recommendations Will Be Considered in Continuing Mgt Review of Facility Performance24 October 1986Ack Receipt of 861016 SALP Rept.Meeting Unnecessary to Discuss Results of Rept.Salp Board Recommendations Will Be Considered in Continuing Mgt Review of Facility PerformanceSystematic Assessment of Licensee Performance
DCL-86-334, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Problem Does Not Exist at Facilities.Eccs Composite Drawing Encl14 November 1986Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Problem Does Not Exist at Facilities.Eccs Composite Drawing Encl
DCL-86-339, Forwards Rev 15 to Physical Security Plan,Per 10CFR73.55 & 50.54(p).Implementation of Changes Expected by 870131. Encls Withheld (Ref 10CFR73.21)21 November 1986Forwards Rev 15 to Physical Security Plan,Per 10CFR73.55 & 50.54(p).Implementation of Changes Expected by 870131. Encls Withheld (Ref 10CFR73.21)
DCL-86-340, Forwards Change to Rev 2 to Safeguards Contingency Plan. Change Withheld (Ref 10CFR73.21)21 November 1986Forwards Change to Rev 2 to Safeguards Contingency Plan. Change Withheld (Ref 10CFR73.21)
DCL-86-342, Forwards Proposed Changes to FSAR Chapter 17,to Be Incorporated Into Appropriate FSAR Update Rev,Pending Approval26 November 1986Forwards Proposed Changes to FSAR Chapter 17,to Be Incorporated Into Appropriate FSAR Update Rev,Pending Approval
DCL-86-356, Responds to NRC Re Violations Noted in Insp Rept 50-275/86-29.Corrective Actions:Status of All Snubber Work in Plant Reviewed,All Status Sheets Updated & Arranged Such That Foreman Could Readily Update & Review Status on Sys15 December 1986Responds to NRC Re Violations Noted in Insp Rept 50-275/86-29.Corrective Actions:Status of All Snubber Work in Plant Reviewed,All Status Sheets Updated & Arranged Such That Foreman Could Readily Update & Review Status on Sys
DCL-87-002, Forwards Response to 861104 Insp Rept 50-275/86-29 & Notice of Violation .In-depth Investigation of Airlock Door Conducted & Listed Weakness Identified.Corrective Actions:Pin in Interlock Box Replaced8 January 1987Forwards Response to 861104 Insp Rept 50-275/86-29 & Notice of Violation .In-depth Investigation of Airlock Door Conducted & Listed Weakness Identified.Corrective Actions:Pin in Interlock Box Replaced
DCL-87-004, Forwards Comments on Regulatory Effectiveness Review Rept on 860519-23 Review.Encl Withheld (Ref 10CFR73.21)9 January 1987Forwards Comments on Regulatory Effectiveness Review Rept on 860519-23 Review.Encl Withheld (Ref 10CFR73.21)
DCL-87-006, Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler12 January 1987Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler
DCL-87-014, Forwards Response to Rev 2 to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. No Cracking or Other Unacceptable ASME Code Discontinuities Identified in Volumetric Insp Performed During First Refueling Outage28 January 1987Forwards Response to Rev 2 to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. No Cracking or Other Unacceptable ASME Code Discontinuities Identified in Volumetric Insp Performed During First Refueling Outage
DCL-87-024, Forwards Public Version of on-the-spot Procedure Change to Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organizations, Per Generic Ltr 81-2712 February 1987Forwards Public Version of on-the-spot Procedure Change to Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organizations, Per Generic Ltr 81-27
DCL-87-041, Forwards Response to Safeguards Violations Noted in Insp Rept 50-275/87-02.Response to Paragraphs 2.D & 10 of Rept Provided in Encl 2.Encls Withheld (Ref 10CFR73.21)5 March 1987Forwards Response to Safeguards Violations Noted in Insp Rept 50-275/87-02.Response to Paragraphs 2.D & 10 of Rept Provided in Encl 2.Encls Withheld (Ref 10CFR73.21)
DCL-87-042, Forwards Rept Providing Verification of Completion of Requested Program,Summary of Valve Operability Prior to Adjustment & Valve Data in Tabular Form,Per Item F of IE Bulletin 85-0039 March 1987Forwards Rept Providing Verification of Completion of Requested Program,Summary of Valve Operability Prior to Adjustment & Valve Data in Tabular Form,Per Item F of IE Bulletin 85-003
DCL-87-045, Responds to Violations Noted in Insp Rept 50-275/87-06 Dtd 870210.Corrective Actions:Investigation Begun,Including Review of Actions Taken & Documentation & Discussions W/Util Personnel,State & County.Emergency Procedure G-3 Revised11 March 1987Responds to Violations Noted in Insp Rept 50-275/87-06 Dtd 870210.Corrective Actions:Investigation Begun,Including Review of Actions Taken & Documentation & Discussions W/Util Personnel,State & County.Emergency Procedure G-3 Revised
DCL-87-121, Forwards Addl Info Re Application for State of Nv Site User Permit for Beatty,Nv Low Level Waste Disposal Site, Including Clarification Re Util Radwaste Processing, Indemnification Agreement & Procedures28 May 1987Forwards Addl Info Re Application for State of Nv Site User Permit for Beatty,Nv Low Level Waste Disposal Site, Including Clarification Re Util Radwaste Processing, Indemnification Agreement & Procedures