 Start dateSiteTitle
05000369/FIN-2017003-0130 September 2017 23:59:59Mcguire
McGuire
Technical Specification (TS) Required Shutdown Due to Reactor Coolant System (RCS) Leakage
05000370/LER-2017-00123 February 2017
26 June 2017
McguireTechnical Specification Required Shutdown Due to Reactor Coolant System Leakage
LER 17-001-01 for McGuire, Unit 2, Regarding Technical Specification Required Shutdown Due to Reactor Coolant System Leakaqe
3F0102-05, Special Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 1222 January 2002Crystal RiverSpecial Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 12
3F0103-03, Response to Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Degradation & Reactor Coolant Pressure Boundary Integrity28 January 2003Crystal RiverResponse to Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Degradation & Reactor Coolant Pressure Boundary Integrity
3F0105-03, License Amendment Request 290, Revision 0, Probabilistic Methodology to Determine the Contribution to Main Stream Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria27 January 2005Crystal RiverLicense Amendment Request #290, Revision 0, Probabilistic Methodology to Determine the Contribution to Main Stream Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria
3F0108-14, License Amendment Request 298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators22 January 2008Crystal RiverLicense Amendment Request #298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators
3F0109-04, License Amendment Request 301, Revision 1: Application to Modify Improved Technical Specifications for Replacement Steam Generators and Response to Request for Additional Information19 January 2009Crystal RiverLicense Amendment Request #301, Revision 1: Application to Modify Improved Technical Specifications for Replacement Steam Generators and Response to Request for Additional Information
3F0198-41, Forwards Vols 1-4,Rev 24 to FSAR for Crystal River Unit 3. Rev Provided as Complete Reissue of FSAR & Pages Marked as Rev 24,dtd 980126.Summary of Changes Made in Fsar,Rev 24 Provided in Attachment A.Rept Will Be Provided by 98021328 January 1998Crystal RiverForwards Vols 1-4,Rev 24 to FSAR for Crystal River Unit 3. Rev Provided as Complete Reissue of FSAR & Pages Marked as Rev 24,dtd 980126.Summary of Changes Made in Fsar,Rev 24 Provided in Attachment A.Rept Will Be Provided by 980213
3F0199-04, LAR 243,Rev 0 to License DPR-72,requesting one-time Rev of ITS to Extend Insp Interval for OTSG Tubes to Coincide with Planned Operating Cycle.Rev 0 to Calculation M-99-0017 & Rev 0 to Calculation AES-C-3543-1 Encl27 January 1999Crystal RiverLAR 243,Rev 0 to License DPR-72,requesting one-time Rev of ITS to Extend Insp Interval for OTSG Tubes to Coincide with Planned Operating Cycle.Rev 0 to Calculation M-99-0017 & Rev 0 to Calculation AES-C-3543-1 Encl
3F0307-07, License Amendment Request 264, Revision 2: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information14 March 2007Crystal RiverLicense Amendment Request #264, Revision 2: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information
3F0398-14, Submits Response to GL 97-05, Steam Generator Tube Insp Techniques17 March 1998Crystal RiverSubmits Response to GL 97-05, Steam Generator Tube Insp Techniques
3F0398-23, Submits Rev 0 to Relief Request 98-001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Services Seawater Sys.Rev 1 to Calculation M-98-0012, Leak Near RWV-129, Encl28 March 1998Crystal RiverSubmits Rev 0 to Relief Request 98-001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Services Seawater Sys.Rev 1 to Calculation M-98-0012, Leak Near RWV-129, Encl
3F0413-01, License Amendment Request 313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions25 April 2013Crystal RiverLicense Amendment Request #313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions
3F0502-01, Day Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.15 May 2002Crystal RiverDay Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
3F0502-06, Technical Specifications Bases Control Program31 May 2002Crystal RiverTechnical Specifications Bases Control Program
3F0506-03, License Amendment Request 264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity25 May 2006Crystal RiverLicense Amendment Request #264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity
3F0506-05, 2005 Technical Specifications Bases Control Program2 May 2006Crystal River2005 Technical Specifications Bases Control Program
3F0515-05, Technical Specifications Bases Control Program27 May 2015Crystal RiverTechnical Specifications Bases Control Program
3F0595-05, TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld31 May 1995Crystal RiverTS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld
3F0598-08, Forwards Rev 0 to AES98033350-1-1, Operational Assessment SG Tube Degradation at Crystal River Unit 3. Results of Assessment Provide Reasonable Assurance That OTSG Tube Integrity Will Be Maintained During Current Operating Cycle18 May 1998Crystal RiverForwards Rev 0 to AES98033350-1-1, Operational Assessment SG Tube Degradation at Crystal River Unit 3. Results of Assessment Provide Reasonable Assurance That OTSG Tube Integrity Will Be Maintained During Current Operating Cycle
3F0599-02, Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.7905 May 1999Crystal RiverRev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790
3F0611-02, Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request 309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations15 June 2011Crystal RiverAttachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request #309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations
3F0695-03, Forwards Response to GL-95-03, Circumferential Cracking of SG Tubes, Per 10CFR50.54(f)22 June 1995Crystal RiverForwards Response to GL-95-03, Circumferential Cracking of SG Tubes, Per 10CFR50.54(f)
3F0698-25, Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl16 June 1998Crystal RiverAdvises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl
3F0698-28, Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG18 June 1998Crystal RiverApplication for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG
3F0704-11, 60-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors26 July 2004Crystal River60-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors
3F0787-04, Submits List of All Pressure Isolation Valves & Description of Periodic Tests or Other Measures Performed to Detect Leakage,Acceptance Criteria for Leakage,Operational Limits & Test Frequency,Per Generic Ltr 87-0610 July 1987Crystal RiverSubmits List of All Pressure Isolation Valves & Description of Periodic Tests or Other Measures Performed to Detect Leakage,Acceptance Criteria for Leakage,Operational Limits & Test Frequency,Per Generic Ltr 87-06
3F0808-01, License Amendment Request 301, Revision 0, Application to Modify Improved Technical Specifications for Replacement Steam Generators28 August 2008Crystal RiverLicense Amendment Request #301, Revision 0, Application to Modify Improved Technical Specifications for Replacement Steam Generators
3F0897-10, Forwards Description of Changes,Reason for Request & Evaluation of Request Re TS Change Request Notice 211,Rev 1, in Response to NRC20 August 1997Crystal RiverForwards Description of Changes,Reason for Request & Evaluation of Request Re TS Change Request Notice 211,Rev 1, in Response to NRC
3F0905-06, License Amendment Request 290, Revision 2 Re Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria9 September 2005Crystal RiverLicense Amendment Request #290, Revision 2 Re Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria
3F0913-02, License Amendment Request 313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information4 September 2013Crystal RiverLicense Amendment Request #313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information
3F0989-01, Discusses Rev to FSAR Radiological Consequences.Changes Establish Revised Licensing Basis for LOCA & Letdown Line Failure Accident Radiological Consequences,Recognizing That Margins Established by 10CFR100 Have Not Been Reduced13 September 1989Crystal RiverDiscusses Rev to FSAR Radiological Consequences.Changes Establish Revised Licensing Basis for LOCA & Letdown Line Failure Accident Radiological Consequences,Recognizing That Margins Established by 10CFR100 Have Not Been Reduced
3F1093-12, Proposed Tech Specs Reflecting Results of Numerous Meetings Re Improved TS15 October 1993Crystal RiverProposed Tech Specs Reflecting Results of Numerous Meetings Re Improved TS
3F1202-03, Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection2 December 2002Crystal RiverResponse to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection
3F1206-02, License Amendment Request 264, Revision 1: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information21 December 2006Crystal RiverLicense Amendment Request #264, Revision 1: Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity and Response to Request for Additional Information
3F1294-01, Forwards Rev 21 to Final Safety Analysis Rept for Crystal River Unit 38 December 1994Crystal RiverForwards Rev 21 to Final Safety Analysis Rept for Crystal River Unit 3
BSEP 04-0109, Report of 10CFR50.59 Evaluation and Commitment Changes27 August 2004BrunswickReport of 10CFR50.59 Evaluation and Commitment Changes
BSEP 05-0059, Request for Notice of Enforcement Discretion Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.13 May 2005BrunswickRequest for Notice of Enforcement Discretion Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.
BSEP 05-0060, Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.17 May 2005BrunswickRequest for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.
BSEP 06-0044, Submittal of Technical Specification Bases Revisions13 April 2006BrunswickSubmittal of Technical Specification Bases Revisions
BSEP 11-0068, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation12 July 2011BrunswickLicense Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation
BSEP 16-0047, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program29 June 2016BrunswickSupplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program
BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.29 June 2017BrunswickApplication to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
BSEP-97-0355, Responds to 970702 RAI Re Conversion to Improved TS for Plant8 August 1997BrunswickResponds to 970702 RAI Re Conversion to Improved TS for Plant
BSEP-97-0443, Suppl to Application for Amends to Licenses DPR-71 & DPR-62, Converting Current TS to Improved Ts,As Contained in Rev 1 of NUREG-1433.Rev a to Improved TS & Revised Responses to 970808 & 970911 RAIs Also Encl13 October 1997BrunswickSuppl to Application for Amends to Licenses DPR-71 & DPR-62, Converting Current TS to Improved Ts,As Contained in Rev 1 of NUREG-1433.Rev a to Improved TS & Revised Responses to 970808 & 970911 RAIs Also Encl
CNS-15-062, Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2)16 July 2015CatawbaRelief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2)
CNS-16-016, Emergency Plan Implementing Procedures, Including Revision 035 to RP/0/A/5000/001 and Revision 036 to RP/0/A/5000/0018 March 2016CatawbaEmergency Plan Implementing Procedures, Including Revision 035 to RP/0/A/5000/001 and Revision 036 to RP/0/A/5000/001
CNS-17-013, Emergency Plan, Revision 17-119 April 2017CatawbaEmergency Plan, Revision 17-1
CNS-17-024, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations25 May 2017CatawbaThird Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations
CNS-18-017, Emergency Plan, Revision 18-1 and 18-224 March 2018CatawbaEmergency Plan, Revision 18-1 and 18-2